background image

5141177-100
Rev 14
© 2006-2015, General Electric Company
All Right Reserved

GE Healthcare

OPERATING DOCUMENTATION

BrightSpeed Elite, Edge, Excel

Pre-Installation Manual

Содержание BrightSpeed Edge

Страница 1: ...5141177 100 Rev 14 2006 2015 General Electric Company All Right Reserved GE Healthcare OPERATING DOCUMENTATION BrightSpeed Elite Edge Excel Pre Installation Manual ...

Страница 2: ...141177 100 REVISION 14 BRIGHTSPEED ELITE EDGE EXCEL PRE INSTALLATION Page 2 Effectivity The information in this manual applies to the following BrightSpeed Series CT Systems BrightSpeed Elite BrightSpeed Edge BrightSpeed Excel ...

Страница 3: ...危險 警告 ZH TW 本維修手冊僅有英文版 若客戶的維修廠商需要英文版以外的語言 應由客戶自行提供翻譯服 務 請勿試圖維修本設備 除非 您已查閱並瞭解本維修手冊 若未留意本警告 可能導致維修廠商 操作員或病患因觸電 機械或其 他危險而受傷 UPOZORENJE HR Ovaj servisni priručnik dostupan je na engleskom jeziku Ako davatelj usluge klijenta treba neki drugi jezik klijent je dužan osigurati prijevod Ne pokušavajte servisirati opremu ako niste u potpunosti pročitali i razumjeli ovaj servisni priručnik Zanemarite li ovo ...

Страница 4: ...y result in injury to the service provider operator or patient from electric shock mechanical or other hazards HOIATUS ET See teenindusjuhend on saadaval ainult inglise keeles Kui klienditeeninduse osutaja nõuab juhendit inglise keelest erinevas keeles vastutab klient tõlketeenuse osutamise eest Ärge üritage seadmeid teenindada enne eelnevalt käesoleva teenindusjuhendiga tutvumist ja sellest aru s...

Страница 5: ...nyt akkor a vevő felelőssége a fordítás elkészíttetése Ne próbálja elkezdeni használni a berendezést amíg a karbantartási kézikönyvben leírtakat nem értelmezték Ezen figyelmeztetés figyelmen kívül hagyása a szolgáltató működtető vagy a beteg áramütés mechanikai vagy egyéb veszélyhelyzet miatti sérülését eredményezheti AÐVÖRUN IS Þessi þjónustuhandbók er aðeins fáanleg á ensku Ef að þjónustuveitand...

Страница 6: ...ų ar kitų pavojų ADVARSEL NO Denne servicehåndboken finnes bare på engelsk Hvis kundens serviceleverandør har bruk for et annet språk er det kundens ansvar å sørge for oversettelse Ikke forsøk å reparere utstyret uten at denne servicehåndboken er lest og forstått Manglende hensyn til denne advarselen kan føre til at serviceleverandøren operatøren eller pasienten skades på grunn av elektrisk støt m...

Страница 7: ...о только на английском языке Если сервисному персоналу клиента необходимо руководство не на английском а на каком то другом языке клиенту следует самостоятельно обеспечить перевод Перед техническим обслуживанием оборудования обязательно обратитесь к данному руководству и поймите изложенные в нем сведения Несоблюдение требований данного предупреждения может привести к тому что специалист по техобсл...

Страница 8: ...ice på utrustningen om du inte har läst och förstår den här servicehandboken Om du inte tar hänsyn till den här varningen kan det resultera i skador på serviceteknikern operatören eller patienten till följd av elektriska stötar mekaniska faror eller andra faror OPOZORILO SL Ta servisni priročnik je na voljo samo v angleškem jeziku Če ponudnik storitve stranke potrebuje priročnik v drugem jeziku mo...

Страница 9: ... engineers All of GE s electrical work on these products will comply with the requirements of the applicable electrical codes The purchaser of GE equipment shall only utilize qualified personnel i e GE s field engineers personnel of third party service companies with equivalent training or licensed electricians to perform electrical servicing on the equipment IMPORTANT X RAY PROTECTION X ray equip...

Страница 10: ... used batteries according to the manufacturer s instructions ATTENTION Danger d Explosion Il y a danger d explosion s il y a replacement incorrect de la batterie Remplacer uniquement avec une batterie du même type ou d un type recommandé par le constructeur Mettre au rébut les batteries usagées conformément aux instructions du fabricant OMISSIONS ERRORS Customers please contact your GE Sales or Se...

Страница 11: ...mponent Noise Levels Updated the cooling requirement table in Section 2 0 Updated Figure 5 1 Sample Room Layout showing approximate EMI requirements in Section 4 0 Chapter 6 updated floor loading specification table in Section 1 0 added GT1700 table illustration in Section 2 0 Updated Table 6 2 Gantry and Table Mounting Requirements in Section 2 0 Added Seismic Mounting illustrations of FWS TIO an...

Страница 12: ...ns updated content for Damage In Transportation Chapter 4 updated gantry width Section 2 1 2 updated Regulated Minimum Working Clearance by Major Subsystem Section 6 4 updated for FWS Seismic information Added note to Section 8 4 Floor levelness Added network specs to Section 9 0 Network Connections Chapter 5 Section 4 0 added note Section 4 2 added EMI of color monitor updated Figure 5 1 Sample R...

Страница 13: ...ents 4 6 27 06 Chapter 3 Updated Table 3 1 BrightSpeed System Options Chapter 4 Updated recommended room layout and minimun room layout Updated Section 8 4 Floor Levelness Chapter 6 Updated seismic mounting bracket in Figure 6 6 Power Distribution Unit Appendix B Updated CT Installation Site Ready Form 3 3 31 06 Chapter 4 Updated room size dimensions and typical room layout Updated Figure 4 4 Typi...

Страница 14: ...GE HEALTHCARE DIRECTION 5141177 100 REVISION 14 BRIGHTSPEED ELITE EDGE EXCEL PRE INSTALLATION Page 14 Revision History ...

Страница 15: ... HPower Table 71 Figure 4 8 Gantry shown tilted 30º top and 30º bottom for BSD Elite Edge Excel with HPower Table 72 Figure 4 9 Table and Gantry Side View for BSD Elite with GT1700 Table 73 Figure 4 10 Gantry shown tilted 30º top and 30º bottom for BSD Elite with GT1700 Table 74 Figure 4 11 Power Distribution Unit NGPDU 75 Figure 4 12 Operator s Console with Standard Table 76 Figure 4 13 TIO Opera...

Страница 16: ...8666 3 111 Figure 6 8 GOC4 LCGOC AIO Operator Console 112 Figure 6 9 TIO and NIO16 Console Seismic Mounting Hole Position 113 Figure 7 1 Gantry with dollies 119 Figure 7 2 Console packing 121 Figure 7 3 Package Symbols Storage 123 Figure 7 4 Proper Gantry Strap Location 125 Figure 8 1 System Ground Map 132 Figure 9 1 System Interconnect Diagram With GOC4 LCGOC Console and GOB Board 139 Figure 9 2 ...

Страница 17: ...nterconnect Box for Europe 1 2 156 Figure 9 13 Power Distribution Interconnect Box for Europe 2 2 157 Figure A 1 Standard Service Access 161 Figure A 2 Front Cover Removal and Storage to Left Side 162 Figure A 3 Front Cover Removal and Storage to Right Side 163 Figure A 4 Front Cover Removal with Table Up Storage to Left Side 164 Figure A 5 Front Cover Removal with Table Up Storage to Right Side 1...

Страница 18: ...GE HEALTHCARE DIRECTION 5141177 100 REVISION 14 BRIGHTSPEED ELITE EDGE EXCEL PRE INSTALLATION Page 18 Table of Figures ...

Страница 19: ...laration con t 39 Table 1 10 Separation Distances 40 Table 3 1 BrightSpeed System Options 47 Table 4 1 List of Scan Room Layouts 51 Table 4 2 List of Control Room Layouts 51 Table 4 3 Console Subsystem 53 Table 4 5 Gantry Subsystem 54 Table 4 4 NGPDU Subsystem 54 Table 4 6 Table Subsystem 55 Table 4 7 UPS Subsystem 56 Table 4 8 A1 Disconnect Subsystem 56 Table 4 9 Equipment to be stored in storage...

Страница 20: ...hcare Supplied Cables for NIO16 Console Standard Run 2281840 14 UL Information 136 Table 9 5 Extended Cables 137 Table 9 6 TIO Console Extended Cables 137 Table 9 7 GE Healthcare Supplied NIO16 Console Cables 138 Table 9 8 GEMS Supplied Cables Optional Long Run UL Information 143 Table 9 9 GE Healthcare Supplied Cables for GOC or TIO Optional Long Run 2281840 4 UL Information 144 Table 9 10 GE Hea...

Страница 21: ...ctrical Equipment for EMC 37 4 1 General Scope 37 4 2 Electromagnetic Emission 37 4 3 Electromagnetic Immunity 38 4 3 1 Limitations Management 40 4 4 Use Limitation 40 4 4 1 External components 40 4 5 Installation Requirements Environment Control 41 4 5 1 Cable Shielding Grounding 41 4 5 2 This product complies the radiated emission as per CISPR11 Group 1 Class A standard limits 41 4 5 3 Subsystem...

Страница 22: ...Regulated Minimum Working Clearance by Major Subsystem 53 2 1 3 Terms and Definitions 57 2 2 Additional Regulatory Clearance Information 58 2 2 1 Minimum Room Size Limited Access 58 2 2 1 1 Regulatory Caution 58 2 2 1 2 Egress Clearance 58 2 2 1 3 Operational Caution 58 2 2 2 System Specifications BrightSpeed 59 2 2 2 1 Recommended Room Size 59 2 2 2 2 Typical Room Size 59 2 2 2 3 Minimum Room Siz...

Страница 23: ...eedom Workspace Table 79 Section 7 0 Minimum Dimensions and Clearances 83 7 1 Options 83 7 2 System Operation 83 7 3 Injector Control 83 Section 8 0 Structural Requirements 84 8 1 Table and Gantry Mounting Requirements 84 8 2 Floor Anchors 84 8 3 Floor Strength 85 8 4 Floor Levelness 85 8 5 Floor Vibration 85 8 5 1 Steady State Vibration 85 8 5 2 Transient Vibration 85 8 5 3 Equipment Location 86 ...

Страница 24: ...101 4 7 UPS 101 4 8 Equipment EMI Envelopes 102 Section 5 0 System Component Noise Levels 102 Chapter 6 Floor Loading and Weights 103 Section 1 0 Floor Loading 103 Section 2 0 Mounting Data Including Seismic 105 Chapter 7 Delivery and Storage Requirements 115 Section 1 0 Delivery to the Facility 115 1 1 Loading Dock Deliveries Preferred methods 115 1 2 Ground Non Loading Dock Deliveries 115 1 2 1 ...

Страница 25: ...2 8 1 Short Term Storage Less than 6 months 122 8 2 Construction Site Storage 122 8 3 Long Term Storage 6 months or more 122 Section 9 0 Extreme Temperature Transportation and Deliveries 123 Section 10 0 Site Environmental Considerations 124 10 1 Dust Dirt Contamination 124 10 2 Chemical Contamination 124 Section 11 0 Handling Requirements 124 11 1 Transportation 124 11 2 Handling Requirements 124...

Страница 26: ...plied Freedom Workspace Table Extended Cables Kit 137 3 3 GEMS Supplied Optional Long Run 143 3 4 GEMS Supplied Cables of Options 146 3 5 Contractor Customer Supplied 148 Section 4 0 Contractor Supplied Components 150 Section 5 0 Fuse 150 Section 6 0 UPS Interconnect 152 Section 7 0 Typical Customer Supplied Wiring 153 7 1 Primary Power Disconnect 153 7 2 Scan Room Warning Light Door Interlock 155...

Страница 27: ...ess specifically mentioned GE Healthcare does not provide or install wires conduits junction boxes and ducts as illustrated in this publication All CT site plans preliminary concepts and final working drawings must be reviewed by General Electric Headquarters Architectural Planning prior to construction or approval Contact your local General Electric sales representative for complete information r...

Страница 28: ...es installed and no remaining ceiling work is required Final floors covering installed with no remaining dust causing floor work required All room millwork installed as shown on the site print All plumbing work in the CT suite is completed No construction in or around the scan suite AREA that will produce Concrete dust Drywall dust Ceiling tile dust Wood sawdust or shaving Dust tracked into the CT...

Страница 29: ...lness and thickness Review HVAC requirements including system regulation and patient comfort Review operational clearances to see if your daily used items fit such as beds and carts Emergency medical equipment should also be considered Storage cabinets and sink if required must be shown on the site print These contractors and others may be required to help confirm that the site meet all installati...

Страница 30: ...ncluding floor thickness meet all of the above requirements Existing HVAC capacity and regulation meet all of the above requirements Existing CT suite meets all of the above regulatory and minimum size requirements Existing facility can accommodate the delivery and meet all of the above delivery requirements Quick Installs are subject to the following restrictions Quick installs must have a new ro...

Страница 31: ...mation Determine delivery route into the scan room Determine if tilt dollies or riggers are required Determine if elevators doorways and hallways are adequate for delivery Determine if floor protection is required Determine if a tilt bed truck is required for ground delivery and ordered Regulatory Requirement Room size meets the minimum requirements Site print is present and accurately reflects th...

Страница 32: ...___________________________ AW Direct Connect address ____________________________________________________________ Do you want HIPAA enabled No___ Yes ___ Do you want automatic downloads enabled No___ Yes ___ Table 1 1 Schedule Date Commitments GE Cust Dates Y N Y N Has the project schedule been verified with facilities department contractor and GE Will the committed site ready date be met Does th...

Страница 33: ... met Name __________________________________________________ Have the specific site requirements been discussed with the contractor Refer to the GE final drawings specifications See Table 1 3 below Has the responsibility of cabling installing and interfacing accessories not on the order been discussed Are all third party vendors identified notified and scheduled Examples Netcom Medrad etc Have all...

Страница 34: ...___ Mandatory Is the network installed are network jacks installed and is the entire network tested Mandatory Broadband VPN installed setup Mandatory Are network software options ordered ____ HIS RIS option ___ DICOM print ___ AW ____ Optional Has modem option ordered _____ Requires a site escalation Optional Is the BrightSpeed service telephone line identified and installed for InSite Electrical ...

Страница 35: ...ntoduction Will acceptance performance testing or bio medical testing be required No__ Yes __ Date ___________ Are trash and or recycling bins available for the removal of papers boxes etc during the installation No__ Yes __ Table 1 6 Miscellaneous Tasks GE Cust Other Must be completed before the scheduled delivery date Y N Y N ...

Страница 36: ...very Route Floor Protection Purchaser Trash disposal Contractors onsite Vendors onsite Options onsite Responsibility GE Complete GE checklist Send copy to vendor Review Options Review Cables Purchaser Purchaser Complete checklist focus on risk Order Options AW network Responsibility GE Leadership Purchaser HVAC Humidity Magnetic interference Environmental cleanliness Patient comfort Responsibility...

Страница 37: ...engths referenced in the MIS MAPS or system cable interconnect diagrams 4 2 Electromagnetic Emission Table 1 7 Emission Declaration EMC Emissions Guidance Declaration for BrightSpeed System The BrightSpeed System is intended for use in the electromagnetic environment specified below The customer or the user of the BrightSpeed System should assure that it is used in such an environment Emissions Te...

Страница 38: ... input output lines 2 kV for power supply lines 1 kV for input output lines Mains power quality should be that of typical commercial or hospital environment Surge IEC 61000 4 5 1 kV line line 2 kV line earth 1 kV line line 2 kV line earth Mains power quality should be that of a typical commercial or hospital environment Voltage dips short interruptionsand voltage variations on power supply input l...

Страница 39: ...in watts W according to the transmitter manufacturer and d is the recommended separation distance in metres m Field strengths from fixed RF transmitters as determined by an electromagnetic site surveya should be less than the compliance level in each frequency rangeb Interference may occur in the vicinity of equipment marked with the following symbol a Field strengths from fixed transmitters such ...

Страница 40: ...ctromagnetic environment in which radiated RF disturbances are controlled The customer or the user of the BrightSpeed System can help prevent electromagnetic interference by maintaining a minimum distance between portable and mobile RF communications equipment transmitters and the BrightSpeed System as recommended below according to the maximum output power of the communications equipment Separati...

Страница 41: ...nents accessories subsystems systems which are electrically connected to the BrightSpeed System must have all AC power supplied by the same power distribution panel line 4 5 4 Stacked Components Equipment The BrightSpeed System should not be used adjacent to or stacked with other equipment if adjacent or stacked use is necessary the BrightSpeed System should be observed in order to verify normal o...

Страница 42: ...GE HEALTHCARE DIRECTION 5141177 100 REVISION 14 BRIGHTSPEED ELITE EDGE EXCEL PRE INSTALLATION Page 42 Chapter 1 Introduction ...

Страница 43: ...ed in the same room as the scanner due to the possibility of chemical contamination of BrightSpeed Series components Such chemicals can contribute to increased equipment failures increased system downtime and decreased reliability Film processor equipment installation must meet the manufacturer s requirements e g ventilation specifications and all applicable national and local codes Also considera...

Страница 44: ...vice clearances shown on the print are observed Using the template P N 5160024 5341997 shipped with the system locate the anchor holes Make sure they clear structural interferences in the floor Clean the area Free the mounting surface of any material that may interfere with the positioning and leveling of the system 1 Lay out the 2 floor templates 2 Start with the Gantry template align per the GE ...

Страница 45: ...pter 2 Pre Installation Overview Page 45 2 Overview Figure 2 1 Hole Locations GANTRY Base TABLE 4 Level or 1M Bubble Level Right Left Back Leveling Pad and Anchor Location 2 Leveling Pad and Anchor Location 3 Leveling Pad and Anchor Location 4 Leveling Pad and Anchor Location 1 Front Paper Template ...

Страница 46: ...GE HEALTHCARE DIRECTION 5141177 100 REVISION 14 BRIGHTSPEED ELITE EDGE EXCEL PRE INSTALLATION Page 46 Chapter 2 Pre Installation Overview ...

Страница 47: ...kit Freedom WorkSpace B78442CA Freedom Workspace Standard B78452CA Freedom Workspace kit Wide B7866AB SmartScore Option EKG Monitor and Recording Device B7900WB SmartScore 4 0 Package B7500PL ConnectPro Option SW Bar Code Reader provides a direct interface to HIS RIS B7500LN ConnectPro HIS RIS SW Key LINUX Hospital Info Sys Radiology Sys Info B7540RB Bar Code Reader B7877BC Bar Code Reader USB B77...

Страница 48: ...TE EDGE EXCEL PRE INSTALLATION Page 48 Section 1 0 Option Catalog Numbers B75212BS B78892AC ASIR Upgrade Note The catalog number with is only for BrightSpeed Elite System with TIO NIO16 console CATALOG NUMBER OPTION DESCRIPTION Table 3 1 BrightSpeed System Options ...

Страница 49: ...er System 2 1 Application The CT scanner system includes hardware and software to support patient data acquisition and image analysis for whole body computed tomography 2 2 Configuration The base scanner system is configured as shown All scan and analysis functions are controlled from the operator s console not shown Figure 3 1 Base Scanner System with HPower Table ...

Страница 50: ...GE HEALTHCARE DIRECTION 5141177 100 REVISION 14 BRIGHTSPEED ELITE EDGE EXCEL PRE INSTALLATION Page 50 Section 2 0 Base Scanner System Figure 3 2 BrightSpeed Elite Base Scanner System with GT1700 Table ...

Страница 51: ...yout A set of short cables B71172CA and a set of long cables B71182CA are optional for BrightSpeed system Note also that where possible the cables should enter the gantry from the rear utilizing the rear cable cover assembly Alternate cable entry is possible at the center of the gantry refer to the Installation template Excess cable length cannot be stored behind the console or PDU Long cable must...

Страница 52: ... requirements must be met Figure 4 1 Regulatory Clearance Requirements for BrightSpeed System Configurations Note See Section 3 0 for Service Clearances 914 to 1219mm 36 to 48 in 914 to 1219mm 36 to 48 in Table Super Structure Footprint Gantry Super Structure Footprint Table Base Cradle Extender Foot Switch Asm 3212mm 10ft 6in 1861mm 6ft 1in 36 28 36 36 2057 mm 6ft 9in Regulatory Compliance Worksp...

Страница 53: ... the following circumstances If the wall or surface directly facing the electrical equipment is grounded e g brick concrete or tile or includes grounded protrusions such as medical gas ports metal door or window frames water sources and metallic sink structures metallic cabinetry electrical disconnects or emergency off panels air conditioners or vents then a 42 in clearance depth is required If th...

Страница 54: ... If the opposite wall is grounded and exposed live parts of 151 600 volts are present 1067 mm 42 in is required Service Access Width Left Right of workspace 762 mm 30 in This is the width of the working space in front of the equipment A minimum of 762 mm 30 in or the width of the equipment whichever is greater is required Head Clearance 1981 mm 78 in This is the height of the workspace measured fr...

Страница 55: ...ipment whichever is greater is required Direction of Service Access Table Sides 914 mm 36 in This distance can be reduced to 711 mm 28 in provided a written and signed approval is obtained by the local team from the local AHJ Authority Having Jurisdiction The signed document must be on file with GE Direction of Service Access Table Foot 711 mm 28 in For the front gantry cover removal a minimum of ...

Страница 56: ...o the ceiling or overhead obstruction s A minimum of 1981 mm 78 in or the height of the equipment whichever is greater is required Table 4 7 UPS Subsystem Work Space Requirement Minimum Clear Space Additional Conditions Direction of Service Access Front of A1 Disconnect 914 4 mm 36 in There are no exposed live part hazards with the cover in place This component is typically serviced from the front...

Страница 57: ...A minimum of 762 mm 30 in or the width of the equipment whichever is greater Head Clearance The height dimension of the workspace The height of the workspace measured from the floor at the front edge of the equipment to the ceiling or overhead obstruction s 1981 2 mm 78 in or the height of the equipment whichever is greater Grounded Wall Any wall that can be electrically conductive to earth ground...

Страница 58: ...vice procedure One Service Engineer shall be able to accomplish all service component replace tasks listed without the need for special tools or equipment such as a tube change detector change and HV tank 2 2 1 1 Regulatory Caution Site prints are required for all system installations including relocation and moves CT room layout as shown on your site print shall meet all regulatory requirements a...

Страница 59: ...llations Typical Room Size 3912 x 5868 mm 12ft 10in x 19ft 3in Same Regulatory requirements apply 2 2 2 3 Minimum Room Size This room size and configuration is the smallest functionally acceptable space for this product Size and layout often eliminate these rooms for future upgrade considerations Due to limited size equipment and regulatory requirements this room often has limited workspace and ve...

Страница 60: ...tion 2 0 Regulatory Clearances 2 2 3 How to Measure How to measure From the farthest outward component No obstruction areas Gantry Side vertical covers outward Front or back vertical covers outward Not from the base covers Table Table cradle covers outward Back of cradle outward Measured from gantry covers ...

Страница 61: ...mm 28 in but greater than 256 mm 14 in measured from the covers to the left sidewall In this configuration service egress and workspace are compromised around the gantry 3310 mm 10ft 10 in to 3665 12 ft Small Room Size Kit 711 mm 28 in but 356 mm 14 in 356 mm 14 in 914 mm 36 in Note To maintain 711 mm 28 in OSHA Egress requirement to the back of the gantry surface floor duct is not an option with ...

Страница 62: ... 0 Regulatory Clearances Room B Less than 36 in but greater than 28 in measured from the covers to the left sidewall In this configuration service egress and workspace are acceptable around the gantry 3665 mm 12 ft to 3868 mm 12 ft 8 in Small Room Size Kit 914 mm 36 in but 711 mm 28 in 711 mm 28 in 914 mm 36 in ...

Страница 63: ...2 5 Recommended Room Size Requirement Layouts Note Your room layout may meet the Recommended or Typical room requirements but look different than the room shown below Contact your sales person to have a detail room layout completed for your site 3962 mm 13 ft 2007 mm 6 ft 7in 1778 mm 5 ft 10 in 2388 mm 7 ft 10 in 6299 mm 20 ft 8 in 2743 mm 9 ft ...

Страница 64: ... Compliance Workspace Clearance Perpendicular to Equipment Regulatory Compliance Minimum Service Clearance Reference Clearance definitions On the following pages Note 1 Mandatory clear space envelope distance perpendicular to the gantry centered over the table Reference Note 3 Note 2 Left or right clear space deviation allowed Envelope shift is not to exceed 457 mm 18 in from table centerline in e...

Страница 65: ...rear or either side of the gantry If gantry service requires both the front and rear covers be removed then these covers must be positioned within the room in such a manner as to not violate the regulatory clearances on any side of the gantry This may necessitate removing the covers from within the suite This should be discussed with the customer and provisions made to accommodate this potential e...

Страница 66: ...e console be maintained at all times for service activity Additionally sufficient space needs to be provided for repositioning of the console and side clearance for rear service access Egress as well as other service requirement shall be considered when siting the console See Figure 4 6 for a Recommended control room layout Section 4 0 Short Footprint Consideration 4 1 Introduction of Short Footpr...

Страница 67: ... of using Short Footprint function NOTICE Cradle limitation must comply with country or local regulatory clearance requirements Cradle movement limitation set for short footprint must be approved by customer during pre installation 1 Refer to Figure 4 4 use floor template with ruler to prearrange the layout and calculate the cradle scannable limitation A 2 Make GE siting print to meet regulatory a...

Страница 68: ...457mm Shown in Figure 4 5 D Gantry left side to wall no less than 356mm 14 in Refer to Section 3 0 for details about Limited Access E Gantry right side to wall no less than 914 mm 36 in If Short Footprint is set for a short room length bigger gantry side clearance is required to remove Gantry rear cover or no removal of rear cover is accepted X Distance from cradle limitation to wall NOTICE It is ...

Страница 69: ...for details The control room must provide a suitable operating environment for the console electronic and operator working comfort The console cannot be dismantled of have components removed or rearranged in configurations other than as shipped If operationally possible the monitor desktop and user desktop components may be removed and placed on a counter top providing the cable lengths shipped ar...

Страница 70: ... easy service access A storage Cabinet is provided as option B77292CA 5 3 Advantage Workstation AW Refer to Advantage Workstation Pre Installation Manual and Installation Service Manual ITEM SIZE WEIGHT TOTAL QA Phantom water filled 20 x 15 cm 7 9 in x 5 9 in 5 5 kg 12 lb 35CM Phantom 35 x 7 cm 13 8 in x 2 8 in 8 2 kg 18 lb 48CM Phantom 48 x 7 cm 18 9 in x 2 8 in 11 4 kg 25 lb Phantom Holder 25 x ...

Страница 71: ...le and Gantry Figure 4 7 Table and Gantry Side View for BSD Elite Edge Excel with HPower Table DESCRIPTION WIDTH DEPTH HEIGHT INCH MM INCH MM INCH MM Color printer 23 584 18 457 7 178 Remote Color Monitor LCD 16 25 413 8 203 16 406 Table 4 10 Dimensions of Accessories MM INCHES 2618 103 1 1060 41 71 1016 40 1930 76 Note Drawing is not to scale AIR IN AIR OUT AIR OUT AIR IN 1930 76 ...

Страница 72: ...SPEED ELITE EDGE EXCEL PRE INSTALLATION Page 72 Section 6 0 Component Dimensions Figure 4 8 Gantry shown tilted 30º top and 30º bottom for BSD Elite Edge Excel with HPower Table AIR OUT AIR IN 2074 81 7 3458 136 1 803 31 6 AIR OUT AIR IN 1938 76 3 3582 141 ...

Страница 73: ...e 4 9 Table and Gantry Side View for BSD Elite with GT1700 Table 991 3ft 3in CRADLE CENTER ISO CENTER SCAN PLANE 1016 3ft 4in 1036 3ft 4 3 4in 2749 9ft 1 4in 1944 6ft 4 1 2in 1094 3ft 7 1 8in AIR OUT AIR IN ISO CENTER SCAN PLANE 430 1ft 4 7 8in CRADLE CENTER 1016 3ft 4in 1944 6ft 4 1 2in 3120 10ft 2 7 8in 533 1ft 9in 475 1ft 6 3 4in AIR OUT AIR IN ...

Страница 74: ...imensions Figure 4 10 Gantry shown tilted 30º top and 30º bottom for BSD Elite with GT1700 Table 1016 3ft 4in 991 3ft 3in CRADLE CENTER 3 0 ISO CENTER SCAN PLANE 2075 6ft 9 3 4in 3595 11ft 9 1 2in AIR IN AIR OUT 1016 3ft 4in 991 3ft 3in 3 0 ISO CENTER SCAN PLANE CRADLE CENTER 3721 12ft 2 1 2in 1940 6ft 4 3 8in AIR IN AIR OUT ...

Страница 75: ...nit NGPDU Power Distribution Unit NGPDU NOTE DIMENSIONS ARE IN INCHES MILLIMETERS REAR VENT AREA 41 8 1062 REAR VIEW TOP VIEW REAR AC POWER INPUT BOX AC POWER INPUT BOX 2 6 67 I O CONNECTIONS PANEL FRONT 2 4 60 27 6 700 21 7 550 NOTES DIMENSIONS ARE IN INCHES MILLIMETERS INDICATES AIR FLOW Convection SERVICE AREA MINIMUM AIR FLOW CLEARANCE 5 9 150 41 8 1062 27 6 700 35 4 900 21 7 550 4 9 125 14 2 ...

Страница 76: ...IGHTSPEED ELITE EDGE EXCEL PRE INSTALLATION Page 76 Section 6 0 Component Dimensions 6 3 Operator s Console Figure 4 12 Operator s Console with Standard Table 705 DIM MIN MAX A 680 883 B 680 807 C 1020 1228 D 426 634 Air In Air Out Min 6 Clearance Wall ...

Страница 77: ...ng Page 77 4 Room Planning Figure 4 13 TIO Operator s Console WALL 100 Min 3 7 8in CLEARANCE 740 2ft 5 1 8in 510 1ft 1 1 8in AIR OUT AIR IN 301 11 7 8in 640 2ft 1 1 4in 640 2ft 1 1 4in 301 11 7 8in 262 10 3 8in 470 1ft 6 1 2in 262 10 3 8in 470 1ft 6 1 2in 510 1ft 1 1 8in 740 2ft 5 1 8in Side View Front View Top View ...

Страница 78: ... s Console SIDE VIEW SIDE VIEW FRON FRONT VIEW VIEW TOP VIEW VIEW BOT BOTTOM VIEW OM VIEW 546 21 5 546 21 5 470 18 5 470 18 5 656 25 8 656 25 8 832 1 32 8 832 1 32 8 WALL 96 3 8 96 3 8 740 29 150 3 150 3 5 9 5 9 176 5 176 5 6 9 6 9 142 2 142 2 5 6 5 6 21 5 21 5 0 8 0 8 491 5 19 4 491 5 19 4 513 20 2 513 20 2 169 7 169 7 6 7 6 7 400 15 7 400 15 7 Air Out Air In ...

Страница 79: ...om Workspace Table Height of Freedom Workspace is adjustable Figure 4 15 Freedom Workspace Table part 5160735 Height Seismic Bracket Supplied with FWS Attach seismic brackets to the gap above the adjustable glide at the bottom of leg using 1 4 bolts 210 8 2 538 21 2 635 25 89 3 5 210 8 25 46 1 8 556 21 9 556 21 9 HEIGHT INCH MM MIN 27 686 MAX 43 1092 ...

Страница 80: ...REVISION 14 BRIGHTSPEED ELITE EDGE EXCEL PRE INSTALLATION Page 80 Section 6 0 Component Dimensions Figure 4 16 Freedom Workspace Table part 5168666 683 26 9 912 36 0 567 22 3 718 28 3 366 14 4 916 36 1 330 13 0 1300 51 2 620 24 4 154 6 1 ...

Страница 81: ...EL PRE INSTALLATION Chapter 4 Room Planning Page 81 4 Room Planning Figure 4 17 Freedom Workspace Table Wide part 5168666 2 683 912 2ft 2 7 8in 2ft 11 7 8in 576 738 1ft 10 5 8in 2ft 5in 379 1ft 2 7 8in 916 3ft 1 8in 66kg 145 5lbs 293 11 1 2in 741 2ft 5 1 8in 1350 4ft 5 1 8in ...

Страница 82: ...PRE INSTALLATION Page 82 Section 6 0 Component Dimensions Figure 4 18 Freedom Workspace Table Standard Narrow part 5168666 3 683 912 2ft 2 7 8in 2ft 11 7 8in 577 722 1ft 10 3 4in 2ft 4 3 8in 373 1ft 2 5 8in 916 3ft 1 8in 60kg 132 3lbs 322 1ft 5 8in 620 2ft 3 8in 1300 4ft 3 1 8in ...

Страница 83: ...nfigurations and lengths Refer to Injector documentation for detailed installation instructions SYSTEM OPERATION MM INCHES Finished ceiling to floor recommended 2743 0mm 108 0 in Finished ceiling to floor minimum 2286 0mm 90 0 in HPower Table max extension head end w extender from Center Line 2030 0mm 80 0 in HPower Table extension head end w extender to obstruction 152 0mm 6 0 in HPower Table in ...

Страница 84: ...pied weight of table and gantry and the individual contact area loading of these components Refer to Section 6 0 for each of the three 3 major components of the BrightSpeed system Support areas of the patient table and gantry must rest on solid concrete not resilient tile or carpeting which will slowly yield over a period of time and disturb alignment of table to gantry Factors that could cause mi...

Страница 85: ... Minimum gantry height at this specification will be 1 2 15 mm to prevent cable crushing Table level may not be achievable if overall floor levelness is greater than the specification Overall floor level must be 0 to use under gantry cable entrance Minimum gantry height will be 3 4 20 mm with this option to prevent cable crushing The use of floor shims is not suitable to achieve floor levelness It...

Страница 86: ...cation of the window is dependent on the position of Operator Workspace position Consult Section 10 0 of this chapter and a qualified radiological health physicist for radiation protection requirements of glass lead content and thickness Note The operator at the Operator Workspace must be able to view the patient during a scan 8 7 Ceiling Requirement The weight of Boom in a room LCD monitor assy i...

Страница 87: ... provided by the customer and it is used to connect the console to a wall box See Notes on Figure 9 5 Some customer site units may require cable duct work or conduit to route connecting network cables to the workstation camera and console The run from the hospital switch to the CT wall outlet must not exceed 88m 290 ft Bandwidth performance is degraded when the length reaches 91m 300 ft or greater...

Страница 88: ... 20 TIO Console and Host Computer Rear To Advantage Workstation if Hispeed connection is required HOST COMPUTER REAR PANEL ETHERNET PORTS A SWITCH HUB B HOSPITAL C GANTRY D BACKUP USB PORTS 1 TRACKBALL 2 MOUSE 3 KEYBOARD 4 BARCODE 5 MODEM 6 TOWER DVD R 7 TOWER DVD RAM 8 TOWER EXTERNAL HARDDISK 9 BACKUP TIO Console Rear TIO Host Computer Rear ...

Страница 89: ...sponsibilities Provide GE Healthcare Installation Project Manager with an accurate site address telephone number contact name and e mail address for the Customer Champion Coordinate VPN activities between Radiology Cardiology and the Information Technology IT departments Act as a focal point in assuring site broad band infrastructure meets GE Healthcare requirements for connection as determined by...

Страница 90: ...ermine site readiness for broad band Contact your Installation Project Manager for the name of the zone Broad Band Specialist Work with the Customer Champion to complete any identified infrastructure changes Provide IP addresses for new CT equipment Provide a VPN compatible appliance that will support the IPSec tunneling protocol and 3DES data encryption Utilize an Internet Service Provider that s...

Страница 91: ...m CTDI phantom body and a 20 cm water phantom head with the technique shown The mAs kV and aperture scaling factors shown in Table 4 11 can be used to adjust exposure levels to the scan technique used at the site Note Actual measurements can vary All measurements have an accuracy of 20 because of measurement equipment technique and system to system variation Use the correction factors shown in Tab...

Страница 92: ...re 4 22 Typical Scatter Survey Head Filter 0 33 0 33 0 65 0 65 1 3 1 3 2 6 2 6 0 33 0 33 0 65 0 65 1 3 1 3 2 6 2 6 HEAD PHANTOM Technique 140 kV 100mA 1 Sec 4 x 5 00mm Technique 140 kV 100mA 1 Sec 4 x 5 00mm 50cm 50cm 50cm 50cm HEAD PHANTOM ISO Contour Lev els 0 33 0 65 1 3 and 2 6 µGy Scan ISO Contour Lev els 0 33 0 65 1 3 and 2 6 µGy Scan ...

Страница 93: ... 4 23 Typical Scatter Survey Body Filter 0 65 0 65 1 3 1 3 2 6 2 6 5 2 5 2 Technique 140 kV 100mA 1 Sec 4 x 5 00mm 50cm 50cm BODY SCATTER PHANTOM 0 65 0 65 1 3 1 3 2 6 2 6 5 2 5 2 Technique 140 kV 100mA 1 Sec 4 x 5 00mm 50cm 50cm BODY SCATTER PHANTOM ISO Contour Lev els 0 65 1 3 2 6 and 5 2 µGy Scan ISO Contour Lev els 0 65 1 3 2 6 and 5 2 µGy Scan ...

Страница 94: ...EALTHCARE DIRECTION 5141177 100 REVISION 14 BRIGHTSPEED ELITE EDGE EXCEL PRE INSTALLATION Page 94 Section 10 0 Radiation Protection Figure 4 24 Fluoro Stand Position Figure 4 25 Scatter Plot of Fluoro Body ...

Страница 95: ...GE HEALTHCARE DIRECTION 5141177 100 REVISION 14 BRIGHTSPEED ELITE EDGE EXCEL PRE INSTALLATION Chapter 4 Room Planning Page 95 4 Room Planning Figure 4 26 Scatter Plot of Fluoro Head ...

Страница 96: ...ION Page 96 Section 11 0 Patient Environment Section 11 0 Patient Environment The patient environment is defined as the following picture Only Scanning Gantry Patient Table components and the following options can be placed in this area Advantage 4D In room monitor SmartStep Extream Injector ...

Страница 97: ...o the presence of sulfide chloride and nitrate contaminates Sulfur is the most damaging If high levels of contaminates exist site may want to consider appropriate air filtration systems Section 1 0 Temperature and Humidity Specifications Environmental specifications apply to the table gantry power distribution unit and operating console NOTICE System Operation and Image Quality may be affected if ...

Страница 98: ...l be installed Note readings before and after installation to verify the true temperature and humidity in your environment Consider heating ventilating air conditioning HVAC needs and redundancy An air conditioner with two compressor units rather than one may prevent system downtime A back up redundant air conditioner permits CT system operation during an extended repair of the primary air conditi...

Страница 99: ...rom 492 ft to 9842 5 ft 150 meters to 3000 meters SYSTEM COMPONENT BTU HR WATT 1 Gantry recommended See NOTE 1 18 766 5 500 2 HPower Table GT1700 Table 682 1023 200 300 3 Power distribution unit 5 118 1 500 Recommended Scan Room Subtotal see notes 24 566 24 907 7 200 7 300 4 Operator s console w 1 IG 2 monitors SCSI Tower 8 189 2 400 MOD Drive Option 682 200 IG Node each Option 1 024 300 Remote Mo...

Страница 100: ...URBANCES FROM 30 MHz TO 1 GHz The Warning statement above is specified by IEC 60601 1 2 First Edition 1993 4 2 Color Monitor Locate color monitors in ambient static magnetic fields of less than 5 x 10 5 tesla 100 milligauss to guarantee color purity and display geometry See Figure 5 1 4 3 Console Computer Equipment Locate computer equipment in ambient static magnetic fields of less than 10 3 tesla...

Страница 101: ...agnetic field of a three phase transformer is much less than that of a bank of three single phase transformers of equivalent power rating Large electric motors are a source of substantial EMI High powered radio signals are a source of EMI Maintain good screening of cables and cabinets 4 7 UPS The Uninterruptable Power Supply UPS provides a consistent power supply to various electrical components o...

Страница 102: ...e gantry during a CT scan acquisition It is less than 75 dBA when measured at a distance of one meter from the nearest gantry surface in any direction Patient Table Gantry Power Distribution Unit Opera tor s Console Laser Camer option GE Storage Cabinet option Injector Control option Slave Monitor option TVMonitor not GE Counter w sink and Base Cabinets TV Camera not GE Note Drawing is not to scal...

Страница 103: ...387 175 852 Rectangular base 17 X 57 5 432 X 1460 with five round pads each 2 5 63 5 in contact with floor Worst case cantilever pull on any bolt is 1235 lb 561 kg Hilti Kwik Bolt II 1 2in 12 7mm diameter by 8in 203mm long per P N 2106573 at three leveling pads into concrete floor Dolly 215 98 Patient Table GT 1700V w 227kg patient 980 445 1481 672 25 6 x 93 3 650 x 2370 493 2408 For round 63 5mm ...

Страница 104: ...419 190 48 8 x 48 6 1240 x 1235 138 666 True In One Console w o monitors 192 87 18 5 X 29 2 470 x 740 99 483 NIO16 Console 176 80 19X29 470X740 Four Casters support Monitor LCD each 20 9 16 5 x 9 7 420 x 247 Freedom Workspace part 5160735 86 39 51 x 26 1295 x 662 Freedom Workspace part 5168666 99 45 51 x 24 1300 x 620 Freedom Workspace part 5168666 2 108 49 53 x 29 1350 x 741 Freedom Workspace par...

Страница 105: ...n the closest adjacent hole the second anchor shall be installed to the standard depth and torque specifications Note If the Installers cannot set all for anchors for the GT1700V table the installer must inform the customer that the minimum anchoring cannot be met and structural engineering contractor is strongly recommended to determine the anchoring method and certify that their anchoring meets ...

Страница 106: ...GE HEALTHCARE DIRECTION 5141177 100 REVISION 14 BRIGHTSPEED ELITE EDGE EXCEL PRE INSTALLATION Page 106 Section 2 0 Mounting Data Including Seismic Figure 6 1 Typical Floor Anchor Gantry and Table ...

Страница 107: ...OR Anchor Anchor Anchor Anchor Left Back Front Anchor Location 2 Anchor Location 1 Anchor Location 4 Anchor Location 3 Note Adjusters are used at each anchor location Anchor hole ID is 1 2 5 cm Void between adjuster and anchor must be filled according to local building codes for siesmic application Redundant Anchor Location Redundant Anchor Location Redundant Anchor Location Right Redundant Anchor...

Страница 108: ...eismic Figure 6 4 Patient Table H Power CT3511A 16 00 406 4 CRADLE EXTEN SION 198 96 5053 6 91 90 2334 3 Z NOTE DIMENSIONS ARE IN INCHES MILLIMETERS CENTER OF GRAVITY CENTER OF GRAVITY IS WITH 450 LB 205 KG PATIENT FULLY EXTENDED This location leveling only 31 55 801 4 96 21 2443 7 12 13 308 1 Z These two locations leveling only No Anchors ...

Страница 109: ...ts Page 109 6 Floor Loading Figure 6 5 Patient Table GT1700 Note See Figure 4 7 for cradle operational limits 378 1ft 2 7 8in 854 2ft 9 5 8in 2242 7ft 4 1 4in 1979 6ft 5 7 8in 844 2ft 9 1 4in 400 CRADLE EXTENDER NOTE CENTER OF GRAVITY IS WITH 227KG PATIENT FULLY EXTENDED 4461 14ft 7 5 8in ANCHOR ANCHOR 325 1ft 3 4in 1ft 3 3 4in ...

Страница 110: ...t NGPDU SERVICE AREA MINIMUM AIR FLOW CLEARANCE NOTES DIMENSIONS ARE IN INCHES MILLIMETERS INDICATES CENTER OF GRAVITY Current PDU Seismic Bracket has holes alreadly drilled Drill holes on the floor accordingly 13 8 350 19 4 494 5 9 150 41 8 1062 27 6 700 35 4 900 21 7 550 9 3 235 4 9 125 14 2 360 SEISMIC MOUNTING HOLES SEISMIC FLOOR MOUNTING HOLES not to scale see note 14 2 360 ...

Страница 111: ...GE HEALTHCARE DIRECTION 5141177 100 REVISION 14 BRIGHTSPEED ELITE EDGE EXCEL PRE INSTALLATION Chapter 6 Floor Loading and Weights Page 111 6 Floor Loading Figure 6 7 FWS Assembly 5168666 3 ...

Страница 112: ...GE HEALTHCARE DIRECTION 5141177 100 REVISION 14 BRIGHTSPEED ELITE EDGE EXCEL PRE INSTALLATION Page 112 Section 2 0 Mounting Data Including Seismic Figure 6 8 GOC4 LCGOC AIO Operator Console 705 ...

Страница 113: ...HCARE DIRECTION 5141177 100 REVISION 14 BRIGHTSPEED ELITE EDGE EXCEL PRE INSTALLATION Chapter 6 Floor Loading and Weights Page 113 6 Floor Loading Figure 6 9 TIO and NIO16 Console Seismic Mounting Hole Position ...

Страница 114: ...GE HEALTHCARE DIRECTION 5141177 100 REVISION 14 BRIGHTSPEED ELITE EDGE EXCEL PRE INSTALLATION Page 114 Section 2 0 Mounting Data Including Seismic ...

Страница 115: ...on Loading Dock Deliveries Facilities without a loading dock require a Lift Gate or Tilt Bed truck Such deliveries require unloading the system components from the truck bed to ground level and then transported to the facility over a smooth surface such as a concrete sidewalk or driveway or paved area Theses paved surfaces must be able to support the weight of the subsystems It may be necessary to...

Страница 116: ...LE SEVERE PERSONAL INJURY OR DEATH THE DOLLIES ARE NOT DESIGNED TO BE USED AS AN ATTACHMENT POINT FOR ANY METHOD OF LIFTING THE SUBSYSTEMS ATTACHING LIFTING STRAPS CABLES OR MECHANISMS TO THE DOLLY HANDLES OR ANY OTHER PART OF THE DOLLY IS STRICTLY PROHIBITED NOTICE If it is determined that the subsystems must be lifted by crane or other lifting method the PM or person responsible for local siting...

Страница 117: ...orizontal fixtures must appear on the order for them to ship with the system If delivery requires vertical lifting the PMI adds the appropriate identifier to the order The gantry ships in a vertical lifting crate with lifting instructions for riggers If delivery requires horizontal lifting the PMI adds the corresponding identifier to the order The gantry ships in a horizontal lifting crate with li...

Страница 118: ...earance dollies go to http www umi dollyshop com 3 3 Tilting Table Dollies Deliveries involving small elevators with a depth of at least 2438 mm 96 in require tilting table dollies If storing the system prior to installation do not order tilt dollies If you are unable to obtain tilt dollies for delivery substitute riggers in their place A limited number of tilt dollies exist for U S deliveries To ...

Страница 119: ...levator manufacturer if gantry weight exceeds elevator capacity Minimum hallway and door size for gantry with covers and dollies attached but side rails removed is 101 6 cm 40 in For alternative lifting arrangements and instructions contact GE Installation Support Services Dollies Dollies can be purchased for international shipments B7850LD or US shipments B7850GD to be used at the customer site A...

Страница 120: ...without side covers installed Covers are shipped in separate boxes The table is mounted with two dollies For the table dimensions with dollies refer to Table 7 3 Section 6 0 Console Considerations LCGOC GOC4 AIO Console The console is shipped without the keyboard table installed The keyboard table is shipped with the console See Figure 7 2 The dimensions of the console alone as shipped are 1170mm ...

Страница 121: ...ions of the console alone as shipped are 740mm 29 in deep 470mm 19 in wide and 640mm 25 in high NIO16 Console The console is shipped without covers installed The covers are delivered in the Product Grade Collector The dimensions of the console alone as shipped measure 830 mm 33 in deep 470 mm 19 in wide and 656 mm 26 in high Section 7 0 PDU Considerations The PDU is shipped on a skid equipped with...

Страница 122: ...bove 8 2 Construction Site Storage When storing the CT system at a construction site be sure to adhere to the following storage requirements Do not damage or puncture the shipping crate Do not remove packaging until all construction is completed at the site and all dust created by the construction is removed Maintain a storage temperature within the range of 10º to 32º C 50º to 90º F Maintain a re...

Страница 123: ...should be avoided during system transportation and delivery Extreme temperatures consist of temperatures below 18º C 0º F or above 49º C 120º F without humidity control When transporting the CT system prevent extended exposure of the system to temperatures or humidity outside of the following specifications Temperature 40º to 70º C 40º to 158º F Humidity 5 to 95 NOTICE Component Freezing occurs if...

Страница 124: ...ime and decreased reliability Film processor equipment installation must meet the manufacturer s requirements e g ventilation specifications and all applicable national and local codes Also consideration s should be given to the location of this equipment and chemical fumes relative to human contact as it relates to locating this equipment and chemicals in the control room Section 11 0 Handling Re...

Страница 125: ...mage resulting from shock or vibration e g monitor CD ROM hard drive or console failure may not become evident until after the system is installed 11 2 3 Avoid Tipping All system components must remain upright at all times avoid tipping them Move the gantry by rolling it on its dollies ONLY do NOT hoist it Avoid tipping or lifting the gantry when moving it through hallways doorways elevators etc N...

Страница 126: ...GE HEALTHCARE DIRECTION 5141177 100 REVISION 14 BRIGHTSPEED ELITE EDGE EXCEL PRE INSTALLATION Page 126 Section 11 0 Handling Requirements ...

Страница 127: ...power wiring between the facility main distribution panel and the PDU should be kept as short as possible When routing the power wiring all three phase wires and ground must be run in the same conduit or raceway duct Power wires should be routed separately from system control and signal cables using a separate conduit or trough in raceway duct Metallic conduit floor duct or surface raceway may be ...

Страница 128: ...4 slice 75 kVA is standard rating 90kVA is an optional rating The BrightSpeed system operates on three phase power meeting the following specifications Note The value in the brackets is for 75kVA Voltage 200 to 480 VAC Capacity 90 kVA 75KVA Frequency 50 or 60 Hz 3 Hz Maximum power demand 90 kVA 75KVA 0 85 PF at a selected technique of 140 kV 380 mA 300mA Average continuous power demand at maximum ...

Страница 129: ...Transients Sags and surges of the power line must not exceed the absolute range limits shown in Table 8 1 Maximum transient voltages should be limited to 1500V peak 2 6 Grounding Metal conduit raceway or the armor of armored cable used to power the system should be bonded to the PDU cabinet However in addition to such mechanical grounding a dedicated 1 0 55 mm2 or larger insulated copper ground wi...

Страница 130: ... size is 112 5 kVA rated 2 4 regulation at unity power factor For this configuration the minimum recommended feeder size and overcurrent protection device based on line voltage is shown in Table 8 2 Minimum Feeder Wire Size In all cases qualified personnel must verify that the transformer and feeder at point of take off plus the run to the BrightSpeed CT scanner meet all the requirements stated in...

Страница 131: ...AWG OR MCM SQ MM VAC 200 VAC 220 VAC 240 VAC 380 VAC 400 VAC 420 VAC 440 VAC 460 VAC 480 VAC 50 15 1 45 2 35 3 30 4 22 4 22 4 22 4 22 4 22 4 22 100 30 1 0 55 1 0 55 1 45 4 22 4 22 4 22 4 22 4 22 4 22 150 46 3 0 85 2 0 70 2 0 70 4 22 4 22 4 22 4 22 4 22 4 22 200 61 4 0 100 4 0 100 3 0 85 2 35 3 30 3 30 4 22 4 22 4 22 250 76 5 0 125 5 0 125 4 0 100 2 35 2 35 2 35 3 30 3 30 4 22 300 91 6 0 170 5 0 12...

Страница 132: ...etal surfaces in the patient vicinity are grounded to the reference ground point For additional information refer to Electrical Safety Equipment Direction 46 014505 Figure 8 1 System Ground Map CONSOLE OC1 1 0 G TABLE GANTRY JUNCTION RACEWAY TABLE CT1 NOTES SHIELD SIGNAL GROUNDS ARE NOT SHOWN GROUND WIRE IN SUPPLIED CABLE DISK UNITS ARE LOCATED IN CC1 AND SCU OPERATOR S 2 POWER DISTRIBUTION UNIT G...

Страница 133: ... appropriate Need for additional junction boxes is minimized by use of either a cable raceway system or a raised computer floor BrightSpeed Series systems use prefabricated cables with large plugs Therefore conduit or pipe is not recommended for cable runs Long cable set B71182CA and short cable set B71172CA are both optional Order the cable set that is required for your site Section 2 0 Component...

Страница 134: ... 4 2 22 Dia 053 65 60 19 8 18 3 2343531 2 LVAC PDU to Console 2587 FT4 600 120VAC 90 12 3 483 3 10 56 4 2 22 Dia 054 n a LVAC Gantry to Table 1015 600 120VAC 3 14 055 28 20 8 5 5 97 2371450 2 Ground PDU to Raceway 1284 VW 1 FT 1 600 0 105 15 5 608 1 1 0 15 8 0 62 Dia 056 68 57 20 8 17 4 2371450 4 Ground Raceway to Console 1283 VW 1 FT 1 600 0 105 11 9 467 1 2 12 2 0 48 Dia 100 32 5 20 9 9 6 1 5120...

Страница 135: ... 600 208Y 120 90 13 8 542 5 8 56 4 2 22 Dia 053 65 60 19 8 18 3 2343531 2 LVAC PDU to Console 2587 FT4 600 120VAC 90 12 3 483 3 10 56 4 2 22 Dia 054 n a LVAC Gantry to Table 1015 600 120VAC 3 14 055 28 20 8 5 5 97 2371450 2 Ground PDU to Raceway 1284 VW 1 FT 1 600 0 105 15 5 608 1 1 0 15 8 0 62 Dia 056 68 57 20 8 17 4 2371450 4 Ground Raceway to Console 1283 VW 1 FT 1 600 0 105 11 9 467 1 2 12 2 0...

Страница 136: ...43528 2 LVAC PDU to Gantry 2587 FT4 600 208Y 120 90 13 8 542 5 8 56 4 2 22 Dia 053 65 60 19 8 18 3 2343531 2 LVAC PDU to Console 2587 FT4 600 120VAC 90 12 3 483 3 10 56 4 2 22 Dia 054 2343596 LVAC Gantry to Table 1015 600 120VAC 3 14 055 28 20 8 5 6 0 2371450 2 Ground PDU to Raceway 1284 VW 1 FT 1 600 0 105 15 5 608 1 1 0 15 8 62 Dia 056 68 57 20 8 17 4 2371450 4 Ground Raceway to Console 1283 VW ...

Страница 137: ...573 2 181 10 3 94 4600 100 USB Extension Cable 1 Trackball 5160574 118 11 3 94 3000 100 PS_2 Extension Cable 1 Keyboard 5160575 118 11 3 94 3000 100 PS_2 Extension Cable 1 Mouse 5160575 2 118 11 3 94 3000 100 SCIM CABLE 1 SCIM 5160576 251 97 3 94 6400 100 Power Code 2 Monitor 5162253 216 54 3 94 5500 100 Table 9 5 Extended Cables PART DESCRIPTION CONNECT TO QUANTITY LENGTH MM INCHES 5160575 2 PS_2...

Страница 138: ...board 1 3000 30 118 11 1 18 5332107 2 CABLE DVI to D SUB VIDEO CABLE Monitor 1 3000 20 118 11 0 79 5315370 CABLE USB TYPE A B PMT media Tower DVD RW USB external HDD 2 2000 78 74 5408703 DP to DVI cable 3 meter Monitor 1 3000 50 118 11 1 97 5432953 2 Power Cable Peripheral Tower to NIO AC Box IEC C14 to C13 Connectors PMT media Tower 1 3050 50 120 1 97 5432953 3 Power Cable Display monitor to NIO ...

Страница 139: ...ceway Footswitches Power Pan System Ground Bus Vault Ground Front Bulkhead J11 TS1 TS2 A1J1 TGPU RUN 050 HVDC Power RUN 051 HVAC Axial Mtr Power Power Pan Bulkhead Footswitch Scan Display Console Monitors Power Cords Monitor Cables SCIM Trackball ICOM Keyboard RUN 056 2 Ground RUN 055 1 0 Ground 1 0 GND 2 GND J26 Mouse Power Panel DARCII Rx Scan LAN Transceiver ETC Panel Frame RUN 102 RJ45 G1 G2 O...

Страница 140: ... Bulkhead J11 TS1 TS2 A1J1 TGPU RUN 050 HVDC Power RUN 051 HVAC Axial Mtr Power Power Pan Bulkhead Footswitch Scan Display Console Monitors Power Cords Monitor Cables SCIM Trackball ICOM Keyboard RUN 056 2 Ground RUN 055 1 0 Ground 1 0 GND 2 GND J26 Mouse Power Panel Rx Scan LAN Transceiver MTCB Panel Frame RUN 102 RJ45 G1 G2 Only for H2 Gantry Footswitch Barcode Reader InSite Modem Video Splitter...

Страница 141: ... Power Pan IPC System Ground Bus Vault Ground Bulkhead J11 TS1 TS2 A1J1 TGPU RUN 050 HVDC Power RUN 051 HVAC Axial Mtr Power Power Pan Bulkhead Footswitch Scan Display Console Monitors Power Cords 2142225 Monitor Cables 2256482 SCIM Trackball ICOM Keyboard RUN 056 2 Ground RUN 055 1 0 Ground 1 0 GND 2 GND rev 09 04 27 J26 Footswitch Mouse Power Panel Media Tower Barcode Reader InSite Modem InSite ...

Страница 142: ...odem AW Power Panel Ceiling Item 8 5116219 Item 10 2213219 Power Video Splitter Out Out In Item 2 2403438 3 Monitor Item 16 2403438 4 In room Monitor Signal IPC PANEL Injector Power Respiratory Monitor EKG Monitor Foot SW HHC GTCB Power Power Signal Trackball J9 Signal Signal RUN 055 1 0 Ground 1 0 GND RUN 056 2 Ground DIP Ethernet RUN 051 DP0 DVI DP1 Video Card Host Computer Hospital Net USB2 0 G...

Страница 143: ...08Y 120 90 13 8 542 5 8 56 4 2 22 Dia 053 80 75 24 5 22 86 2343531 LVAC PDU to Console 2587 FT4 600 120VAC 90 12 3 483 3 10 56 4 2 22 Dia 055 63 55 19 3 16 76 2371450 Ground PDU to Raceway 1284 VW 1 FT 1 600 0 105 15 5 608 1 1 0 15 8 0 62 Dia 056 83 75 25 5 22 86 2371450 3 Ground Raceway to Console 1283 VW 1 FT 1 600 0 105 11 9 467 1 2 12 2 0 48 Dia 100 70 62 21 4 18 86 5120646 Signal Gantry MSUB ...

Страница 144: ...ia 052 63 57 19 3 16 76 2343528 LVAC PDU to Gantry 2587 FT4 600 208Y 120 90 13 8 542 5 8 56 4 2 22 Dia 053 80 75 24 5 22 86 2343531 LVAC PDU to Console 2587 FT4 600 120VAC 90 12 3 483 3 10 56 4 2 22 Dia 055 63 55 19 3 16 76 2371450 Ground PDU to Raceway 1284 VW 1 FT 1 600 0 105 15 5 608 1 1 0 15 8 0 62 Dia 056 83 75 25 5 22 86 2371450 3 Ground Raceway to Console 1283 VW 1 FT 1 600 0 105 11 9 467 1...

Страница 145: ...Y 254 90 15 3 604 4 14 11 2 44 Dia 052 63 58 19 3 17 56 2343528 LVAC PDU to Gantry 2587 FT4 600 208Y 120 90 13 8 542 5 8 56 4 2 22 Dia 053 80 75 24 5 22 86 2343531 LVAC PDU to Console 2587 FT4 600 120VAC 90 12 3 483 3 10 56 4 2 22 Dia 055 63 55 19 3 16 76 2371450 Ground PDU to Raceway 1284 VW 1 FT 1 600 0 105 15 5 608 1 1 0 15 8 62 Dia 056 83 75 25 5 22 86 2371450 3 Ground Raceway to Console 1283 ...

Страница 146: ...ole To LCD 1015 VW 1 600 0V 105 1 8 15 4 6 2403438 4 HD 15 FEMALE TO HD 15 MALE 15 FEET 1Vp p 60 8 0 0 315 5 26 1 3 0 4 2355108 JUMPER CABLE FOR ADAPTING 2286150 TO WORK WITH H POWER MSUB 8 22 UPS 15 4 6 2391751 POWER CABLE NGPDU TO UPS 2587 FT4 600 208VAC 90 5 8 0 228 5 8 15 4 6 2391751 3 POWER CABLE UPS DISCONNECT PANEL TO NGPDU 2587 FT4 600 208VAC 90 5 8 0 228 4 8 45 13 6 5169224 UPS CONTROL CA...

Страница 147: ... and Cables Adv 4D Resp 100 30 5 5199717 GANTRY TO RPM UNIT 2464 FT4 300 30VDC 80 6 6 0 26 4 22 37 1 45 Dia OPTION LENGTH ACTUAL USABLE UL CABLE INFORMATION UL Style Flam Rating Voltage Rating Voltage Actual Temp Rating C Dia mm inch of Cond Size AWG PULL SIZE MM INCHES ft m PART DESCRIPTION Table 9 11 GEMS Supplied Cables for Options UL Information ...

Страница 148: ...OURCE A1 Maximum Run Length 3 POWER 3 1 3 1 1 1 0 50 GROUND 3 1 3 1 RUN NO 2 FROM FACILITY DISCONNECT TO POWER MODULE A1 PM MAXIMUM RUN LENGTH 3 POWER 3 1 3 1 1 1 0 50 GROUND 3 1 3 1 1 NEUTRAL Not Required 3 1 3 1 RUN N0 3 FROM FACILITY DISCONNECT TO SYSTEM EMERGENCY OFF A1 SEO 2 14 2 POWER 6 2 6 2 1 14 2 GROUND 6 2 6 2 RUN NO 4 POWER MODULE TO WARNING LIGHT CONTROL PM WL 2 14 2 WARNING LIGHT 24 V...

Страница 149: ...r the system 5 10 OPTION KEY TO TELEPHONE SYSTEM see Note 1 NOTES 1 Used for remote diagnostics Option 2 Refer to the appropriate Pre installation Installation documents for the Laser Camera 3 Category 5 cable Use one of the following patch cords CAT Num GE Part Num Length K9000WB 2215028 10 20 m K9000KP 2215028 5 10 m K9000JR 2215028 4 5 m K9000WA 2215028 9 3 m 4 In order to avoid any violation o...

Страница 150: ...omponents Reference the system installation drawings supplied by Installation Support Services within your geographic area Refer to Table 9 16 on page 152 Table 9 13 Contractor Supplied Components ITEM NUMBER QTY FRU CODE DESCRIPTION NAME 1 2351493 1 0 Yes 100A FUSE 2 2364059 1 0 Yes GLASS FUSE 3 46 170021P50 1 0 Yes FUSE 12 AMPS 250 VOLTS BUSSMAN MDA12 DUAL ELEMENT 4 46 170021P15 1 0 Yes Time Lag...

Страница 151: ...6 170021P10 2 Yes 006 000A 0250V 3AG FAST UL C REVIEWED TK 7 91 8 46 170021P101 1 Yes FUSE 20 AMPS 700 VOLTS 2 LONG X 9 16 DIA FAST BLOW 9 46 170021P106 1 Yes FUSE 8 AMPS 250 VOLTS BUSSMANN ONLY 10 46 170021P31 2 Yes One HalfA 250V SLO BLO FUSE TYPE 3AG 1 25aprox X 0 25aprox GLASS BODY REVIEWED TK 7 91 11 5329469 2 Yes FUSE 20 AMPS 500 VOLTS 3 SECONDS RoHS 12 46 327160P1 1 Yes 12 0A 125VAC DUAL EL...

Страница 152: ...d A1 37 45 GE supplied Input cable 7 15 A1 SEO UPS 3 phase power source Output cable 7 15 35 max Legend Cable lengths are Usable Actual 37 45 PDU Customer supplied PDU Type Model Max Mom kVA Rating Recommended Main Disconnect A1 Cat Optional Partial UPS Kit Cat America EMEA Asia NGPDU 3 2326492 3 90kVA E4502AB 90A or E4502AC 110A incl Auto Restart Integrated UPS Control E46001AC incl Auto Restart ...

Страница 153: ...e 153 9 Interconnects Section 7 0 Typical Customer Supplied Wiring 7 1 Primary Power Disconnect Requires LOTO compatible disconnect to install this system If a UPS is required a GE Disconnect is strongly recommended for safe operation The GE disconnect and UPS are designed to work together Figure 9 7 Primary Power Disconnect A1 ...

Страница 154: ... DIRECTION 5141177 100 REVISION 14 BRIGHTSPEED ELITE EDGE EXCEL PRE INSTALLATION Page 154 Section 7 0 Typical Customer Supplied Wiring Figure 9 8 Primary Power Disconnect A1 Fusible Disconnect and Magnetic Contactor ...

Страница 155: ...pical TS6 Warning Light Door Interlock Connections Figure 9 10 TS6 Room Door Interlock Connections With a Door Interlock Figure 9 11 TS6 Room Door Interlock Connections Without a Door Interlock 10 9 Door Switch PGND EXP_INTLK 1 2 3 4 N O Door Switch 5 6 7 8 9 10 If not using a door switch add a jumper I f jumper is not in place exposures will not be made Check this jumper if you get scan interlock...

Страница 156: ...N 14 BRIGHTSPEED ELITE EDGE EXCEL PRE INSTALLATION Page 156 Section 8 0 Recommended Power Distribution System For Europe Section 8 0 Recommended Power Distribution System For Europe Figure 9 12 Power Distribution Interconnect Box for Europe 1 2 ...

Страница 157: ...ALTHCARE DIRECTION 5141177 100 REVISION 14 BRIGHTSPEED ELITE EDGE EXCEL PRE INSTALLATION Chapter 9 Interconnection Data Page 157 9 Interconnects Figure 9 13 Power Distribution Interconnect Box for Europe 2 2 ...

Страница 158: ...GE HEALTHCARE DIRECTION 5141177 100 REVISION 14 BRIGHTSPEED ELITE EDGE EXCEL PRE INSTALLATION Page 158 Section 8 0 Recommended Power Distribution System For Europe ...

Страница 159: ...in this appendix 1 2 Front Cover Removal Rather than storing the front cover straight forward from the gantry at the foot of the table the cover can be moved and stored on the right or left side of the table if there is space available while still maintaining service access to the table Additionally the cover can be moved out of the scan room to a temporary storage location The standard procedure ...

Страница 160: ...mps is prohibited 1 4 Condition References There are three possible minimum service space requirements based on the construction of the wall directly adjacent to the side of the gantry The following three conditions determine the minimum space requirement that would apply to the room based on the special conditions of the wall Condition 1 If the side of the system being serviced is directly facing...

Страница 161: ...GE HEALTHCARE DIRECTION 5141177 100 REVISION 14 BRIGHTSPEED ELITE EDGE EXCEL PRE INSTALLATION Appendix A Alternate Cover Removal Options Page 161 A Covers Figure A 1 Standard Service Access ...

Страница 162: ...GE HEALTHCARE DIRECTION 5141177 100 REVISION 14 BRIGHTSPEED Page 162 Section 1 0 Alternate Cover Removal Options Figure A 2 Front Cover Removal and Storage to Left Side ...

Страница 163: ...ALTHCARE DIRECTION 5141177 100 REVISION 14 BRIGHTSPEED ELITE EDGE EXCEL PRE INSTALLATION Appendix A Alternate Cover Removal Options Page 163 A Covers Figure A 3 Front Cover Removal and Storage to Right Side ...

Страница 164: ...GE HEALTHCARE DIRECTION 5141177 100 REVISION 14 BRIGHTSPEED Page 164 Section 1 0 Alternate Cover Removal Options Figure A 4 Front Cover Removal with Table Up Storage to Left Side ...

Страница 165: ...ARE DIRECTION 5141177 100 REVISION 14 BRIGHTSPEED ELITE EDGE EXCEL PRE INSTALLATION Appendix A Alternate Cover Removal Options Page 165 A Covers Figure A 5 Front Cover Removal with Table Up Storage to Right Side ...

Страница 166: ...GE HEALTHCARE DIRECTION 5141177 100 REVISION 14 BRIGHTSPEED Page 166 Section 1 0 Alternate Cover Removal Options Figure A 6 Rear Cover Removal and Storage Straight Back ...

Страница 167: ...HCARE DIRECTION 5141177 100 REVISION 14 BRIGHTSPEED ELITE EDGE EXCEL PRE INSTALLATION Appendix A Alternate Cover Removal Options Page 167 A Covers Figure A 7 Rear Cover Removal and Storage to Left or Right Side ...

Страница 168: ...GE HEALTHCARE DIRECTION 5141177 100 REVISION 14 BRIGHTSPEED Page 168 Section 1 0 Alternate Cover Removal Options Figure A 8 Rear Cover Gantry Angled Storage in Corner ...

Страница 169: ...CT ...

Страница 170: ...170 www gehealthcare com ...