43 | GE Oil & Gas
© 2016 General Electric Company. All rights reserved.
QQQ
RRR
PPP
TT
ASSEMBLY
FROM
STEP 56A
Figure 42
SIDE VIEW
PPP
DIAPHRAGM
ASSEMBLY #1
10:00
TOP VIEW
FRONT VIEW
TOP SPACER
(PPP)
ORIENTATION
PORT IS AT
10 O’CLOCK
ASSEMBLY
FROM
STEP 51A
EEE
Figure 41
Spring Chamber Assembly
(Figures 41-44)
Step 56: This step is dependent on the model of PID being
assembled:
A. For a VRP-600-SB-PID, place the Top Spacer (PPP) below the
assembly from Step 51A. Thread the Small Piston (II) from
Diaphragm Assembly #1 into the Bottom Piston (EEE) of the
assembly from Step 51A. Thread the Small Piston (II) all the
way by hand until it stops.
DO NOT use a wrench.
B. Place the assembly from Step 56A onto the Top Feedback
Chamber (TT). Secure the assembly with 6 Fiberglass Washers