Becker VRP-B-CH Series Valve Regulator Pilot Instruction Manual | 18
© 2016 General Electric Company. All rights reserved.
4. Test the pilot body block (F) for leakage. Using 1/4-in NPT
plugs, plug the orifice block ports (K), and the gauge manifold
(N).
4a. Connect a pressure source to the orifice block (K) as
shown. Use approximately 100 psig for testing.
4b. With the pressure source activated, soap test around the
balanced valve assembly ( C) on both the bottom and the
top of the pilot. Place a bubble on the exhaust port and
check for leakage (cross drilled hole must be blocked in
order to check “EX” port)
4c If any leakage is detected, repeat the assembly procedure
from step 1.
4d. Remove all plugs from all blocks/manifolds (K and N).
K
C
F
N