© 2019 Baker Hughes, a GE company, LLC. All rights reserved.
44 |
=
BHGE
Open Stops Adjustments
In some valves the stem travel exceeds the nominal valve travel. The SVi1000 allows you to com-
pensate for this so that the valve position reads 100% at the nominal travel. The acceptable
range is between 60%-100% of possible mechanical travel.
To perform open stops adjustments:
1. Press the upper stop adjustment button for two to seven seconds, until green LED
2 illuminates, then release. Green LED 2 flashes.
2. Move the valve to the desired location via the
Open Stop Adjustment Screw
Figure 21
Open Stop Adjustment Screw
3. Press the upper stop adjustment button for more than two seconds.
The green light goes off, the new stop is saved in the device and the unit is put into
Normal mode.
Press
Cancel
to abort the process and the green LED 1 goes off, the device returns
to Normal mode and no changes occur.
Open Stop
Adjustment
Upper Stop
Button and
LED 2
Screw
Cancel
Button and
LED 4
Содержание BAKER HUGHES Masoneilan SVi 1000
Страница 1: ...Masoneilan SVi 1000 Positioner Quick Start Guide Rev L BHGE Data Classification Public...
Страница 8: ...This page intentionally left blank...
Страница 18: ...This page intentionally left blank...
Страница 38: ...This page intentionally left blank...
Страница 56: ...This page intentionally left blank...
Страница 86: ...This page intentionally left blank...
Страница 87: ......