background image

Modifications Reserved 
OPM_ITS_USM_M06_M20_0US_V011  (09/2007)

 

GE Consumer & Industrial 

Power Quality 

 

 

 

User Manual 

Digital Energy™ Uninterruptible Power Supply 

IT Series

 

-Line Interactive/True Sine Wave UPS

 

 

Tower Models 

600, 1000, 1500, 2000VA 

 

Rack Mount Models 

600, 1000, 1500, 2000VA 

 
 
 
 
 
 
 
 
 
 
 

 
 
 

GE Consumer & Industrial – Power Quality 
Digital Energy™ 

701 E 22

nd

 Street 

Suite 300 
Lombard, IL 60148 USA 

T  800-637-1738 

www.geindustrial.com/ups

 

 

 

 

 

 

Содержание Amersham Imager 600

Страница 1: ...al Digital Energy Uninterruptible Power Supply IT Series Line Interactive True Sine Wave UPS Tower Models 600 1000 1500 2000VA Rack Mount Models 600 1000 1500 2000VA GE Consumer Industrial Power Quali...

Страница 2: ...lace for future reference General Electric Consumer Industrial All rights reserved reproduction without permission prohibited The content of this manual may be subject to change without prior notice n...

Страница 3: ...3 Charge the battery 3 3 4 Connect to utility supply 3 3 5 Check the site wiring fault indicator 3 3 6 Advanced monitoring software 3 3 7 Rack mounting installation 4 Layout Control Panel 5 4 1 Front...

Страница 4: ...k Security Recommendations 8 Maintenance and Storage 12 8 1 Maintenance 8 2 Storage Conditions 8 3 Extended Storage Conditions 9 Battery 13 9 1 Battery Life 9 2 Battery Rules 9 3 Safety precautions 9...

Страница 5: ...ges Do not open the unit there are no user serviceable parts inside All maintenance and service work except replacement of the batteries should be performed by qualified service personnel After switch...

Страница 6: ...ly even when UPS power switch is OFF Furthermore in order to save battery energy UPS can automatically turn the charger OFF under backup mode if none of the connected loads are operating The visual an...

Страница 7: ...Contact the GE UPS Service Center for help at 800 637 1738 NOTE This warranty does not cover failures of the product which result from incorrect installation misuse alterations by persons other than a...

Страница 8: ...components pinched wires and cables or not correctly inserted plugs This UPS is intended for use in a controlled indoor environment free of conductive contaminants and protected against animal intrusi...

Страница 9: ...cording to applicable EMI EMC standards There is a possibility that interference to radio TV can occur in a particular installation If UPS causes interference to radio or television reception which ca...

Страница 10: ...ile installing the new battery to avoid short circuits BUCK AVR VOLTAGE REDUCTION indicator AMBER LED The LED illuminates when the UPS is correcting a high utility voltage condition The loads receive...

Страница 11: ...ector Telecom transfer IN OUT ports provide users to extend the RJ11 cable applications CAUTION To reduce the risk of fire use only No 26AWG or larger RJ11 telecommunication line cord OUTPUT POWER REC...

Страница 12: ...relay signal to support for DOS WINDOWS and other operating systems USB Provided to support for DOS WINDOWS and other operating systems COMMUNICATION CARD INTERFACE SLOT used for optional SNMP commun...

Страница 13: ...rms a self test function During the self test the UPS operates in back up mode Note During the self test the UPS briefly supplies the loads from battery input the on battery LED illuminates If the UPS...

Страница 14: ...iminate the overload alarm 7 Software and Interface Port 7 1 Power Monitoring Software The Digital Energy IT Series UPS MONITORing software uses standard RS 232 interface or USB port to perform monito...

Страница 15: ...face USB port configuration The USB computer interface port located on rear of UPS has the following characteristics Immediately after connecting the UPS through USB port to a PC a pop up message near...

Страница 16: ...municate with them CAUTION Failure to take such preventative security measures could result in loss or misuse of data collected by these systems and in some cases could permit unauthorized access to t...

Страница 17: ...be taken to avoid electric shock and burns caused by contacting battery terminals or shorting terminals during battery installation 9 2 12 Do not touch uninsulated battery terminals 9 2 13 The instal...

Страница 18: ...2 batteries 1500VA 3 batteries 2000VA 4 batteries Please call your local GE representative for pricing and availability 9 5 Hot Swappable Battery Replacement Tower Procedure Step 1 Remove front cover...

Страница 19: ...TS_USM_M06_M20_0US_V011 09 2007 600 1000VA 1500 2000VA Step 3 Remove inside battery cover plate 600 1000VA Unscrew metal cover plate Phillips head screws Put screws in a safe location for reconnection...

Страница 20: ...Step 4 Carefully slide batteries out 600 1000VA Pull tabs attached to battery out toward front to remove batteries See diagram below 600 1000VA 1500 2000VA Pull tray to remove batteries See diagram be...

Страница 21: ..._ITS_USM_M06_M20_0US_V011 09 2007 600 1000VA 1500 2000VA Disconnect Black wire Disconnect Red wire Continue to slide batteries out See diagrams below 1500 2000VA Step 6 Remove batteries from UPS case...

Страница 22: ...Step 8 Connect Jumper wire s to the and of the new batteries as shown in diagrams above Step 9 Before inserting the batteries into the unit Connect the Black and Red Wire on the terminal as shown in...

Страница 23: ...e Step 12 Install Metal Battery cover plate Install metal plate with Phillips head screws Step 13 Re Install Left front cover first by using the Phillips head screws Put the Right front cover on the R...

Страница 24: ...Modifications Reserved 20 OPM_ITS_USM_M06_M20_0US_V011 09 2007 600VA 1000VA 1500 2000VA Step 3 Unscrew Left side panel by removing Phillips head screws See diagrams below 600VA 1000VA...

Страница 25: ...00VA Step 4 Remove inside Battery cover plate Unscrew metal cover plate Phillips head screws Put screws in a safe location for reconnection See diagrams below 600VA 1000VA 1500 2000VA Step 5 Carefully...

Страница 26: ...Modifications Reserved 22 OPM_ITS_USM_M06_M20_0US_V011 09 2007 600VA 1000VA 1500VA 2000VA Step 6 Disconnect Wires Disconnect Black and Red wires Continue to pull batteries out See diagrams below...

Страница 27: ...Modifications Reserved 23 OPM_ITS_USM_M06_M20_0US_V011 09 2007 600VA 1000VA 1500VA 2000VA...

Страница 28: ...Step 8 Install New Batteries using same battery type and layout as shown in diagrams above Step 9 Connect Jumper wire s to the and of the new batteries as shown in diagrams above Step 10 Before insert...

Страница 29: ...ernal failure Contact the GE UPS Service Center for help at 800 637 1738 Alarm continues sounding Overload Remove some load Input circuit breaker on the rear panel has tripped Reset Input circuit brea...

Страница 30: ...mperature F C 3 500 meters max elevation 32 95 F 0 35 C Humidity 0 95 humidity non condensing of Outlets NEMA 5 15R Tower 4 Rack Mount 4 Tower 4 Rack Mount 4 Tower 6 Rack Mount 4 Tower 6 Rack Mount 6...

Страница 31: ...ch W x D x H Volume cu ft UPS0600ITSIT 13 80 30 42 14 80 32 63 265x550x340 10 4x21 7x13 4 1 75 UPS1000ITSIT 15 00 33 07 16 00 35 27 265x550x340 10 4x21 7x13 4 1 75 UPS1500ITSIT 25 00 55 12 27 00 59 52...

Отзывы: