DEH40151 

DEH40151   Rev.No.02 

7

 

 

Figure 6 Distance between Crossbar and SF breaker 

 

These instructions do not cover all details or variations in equipment nor do they provide 
for every possible contingency that may be met in connection with installation, operation, 
or maintenance. Should further information be desired or should particular problems arise 
that are not covered sufficiently for the purchaser’s purposes, the matter should be 
referred to the GE Company. 

 

Содержание A-Series II Panelboard

Страница 1: ...WS 10 32 X 3 8 N722P16006B6 4 Installation WARNING Before attempting to install one of these kits remove all power from the panelboard Use the following procedure to install a SF circuit breaker kit Call out numbers in the illustrations and numbers in brackets in the text refer to the Item Numbers in Table 1 Installation of a three pole kit is illustrated in Figure 1 or Figure 2 1 Remove the inter...

Страница 2: ...erior catalog number ASPP6SF3S into an A Series II Panelboards 5 Refer fig no 2 to mount the breaker on left side of interior Place branch base for A phase 2 adjacent to cross bar 13 as shown in fig 1 and insert the screw 7 through slot provided for A phase to clamp it with main busbar Similarly mount B phase 1 branch busbar to B phase main busbar but adjacent to A phase branch base and C phase 3 ...

Страница 3: ... to the underside of the breaker terminal with the screws 5 Take care to assemble the screws to the spools as shown in Figure 1 or Figure 2 with the tapped end of the spool toward the breaker terminal 8 Place the breaker over branch base 1 2 and 3 align the spool 4 with protruded opening in branch bases and tighten the three 28 X 1 3 8 screws 5 installed in step 7 to 60 in lb Maximum 9 Insert two ...

Страница 4: ...ated in Figure 4 Fasten filler plate to the dead front with four 10 32 x 3 8 screws 12 tightened to 27 36 in lb 12 To install branch breaker kit ASPP6SF3S on right side of interior flip filler plate 11 and place it over the dead front so that the four same size holes line up with the threaded holes of the dead front as similar to step 11 Fasten filler plate to the dead front with four 10 32 x 3 8 ...

Страница 5: ...d after SG as shown in Figure 5 then gap between the breakers dim A has to be followed as mentioned in Table 2 Replace the subsequent blank filler of dead front with SF filler plate given in kit ASPP6SF3S using steps 10 to 13 15 If SF breaker has to be installed immediately after crossbar as shown in Figure 6 then gap between the breaker and crossbar has to be 0 061inch ...

Страница 6: ...DEH40151 DEH40151 Rev No 02 6 Figure 5 Distance between breakers Table 2 Distance between breakers Gap with Breaker A in SG 0 582 ...

Страница 7: ...riations in equipment nor do they provide for every possible contingency that may be met in connection with installation operation or maintenance Should further information be desired or should particular problems arise that are not covered sufficiently for the purchaser s purposes the matter should be referred to the GE Company ...

Страница 8: ...DEH40151 DEH40151 Rev No 02 8 g GE Industrial Systems ...

Отзывы: