6. Insert the Inverter by pressing the
“
Inverter ON
”
( I ) key on all other units.
Do not start the next
Inverter
until the sequence of the previous ends.
•
As soon as the output power of the
Inverters
is sufficient to supply the
Load
, the output of the units with
running
Inverter
will transfer to
Inverter
.
•
LED Alarm
turn Off and the
LED Operation
must be lit.
The
Synoptic Diagram
, on all UPS units, must display the status
“
LOAD SUPPLIED BY INVERTER
”
.
Synoptic Diagram of first unit
Synoptic Diagram of other units
7. Load supply.
SG Series 400 & 500 Parallel System
is now running, supplying power to the output.
Insert the
Loads
one by one to the output of the
SG Series 225 & 300 Parallel System
.
Check the output current value of
L1
,
L2
and
L3
and check for correct load balance.
8. Operation mode selection.
SG Series 400 & 500 Parallel System
is delivered normally selected for permanent
VFI
operation.
eBoost™ Operation Mode
can be enabled if available, and the
eBoost START
time &
eBoost STOP
time can
be programmed for each day of the week (see
Section 6.4 SETUP / eBoost)
.
END OF PROCEDURE
NOTE !
The
Battery
must be charged for at least 10 hours, in order to ensure the full backup
runtime in case of a
Utility Failure
.