Modifications reserved
Page 43/79
OPM_SGS_USM_M40_M50_2US_V010.doc
User Manual
SG Series 400 & 500 UL S2
6.5 COMMANDS
The
COMMANDS mode
is entered any time the “
CMDS
” button is pressed.
Allows the user to execute UPS operation commands.
In this mode the buttons perform the following functions:
Return to HOME screen.
Scrolls forward to the next screen.
V
Scrolls forward to the next line.
Confirm the selection made.
It is possible to view any pushbutton functional description by pushing the button for more than 3
seconds.
`
Home\Commands
COMMANDS
LAMP TEST
INVERTER
ON
INVERTER
OFF
RECTIFIER
ON
V
Commands screen 1
LAMP TEST
Signaling
LEDs
test and
buzzer
test (all LED should be lit and
blinking and the acoustical alarm should be activated).
INVERTER ON
Command to switch the inverter.
INVERTER OFF
Command to shutdown the inverter.
RECTIFIER ON
Command to switch the rectifier.
Only for Service Center, the command
access is protected by a code.
NOTE !
When
eBoost™ Operation Mode
is enabled, control of Inverter status and selection
of the feed path is done autonomously by the UPS control logic.
Therefore, Inverter ON / Inverter OFF commands are disabled when
eBoost™
Operation Mode
is enabled.
`
Home\ Commands
COMMANDS
RESET TOTAL OFF
REQUEST
TOTAL
OFF
V
Commands screen 2
RESET TOTAL OFF
Reset
Total OFF
command should be executed to switch ON
UPS after a
“Load Off”
operation.
REQUEST TOTAL OFF
Command
“Load Off”
.
Screen sequence to execute the command
“
Load
Off”
:
`
Home\Commands
`
Home\Commands
COMMANDS COMMANDS
RESET TOTAL OFF
RESET TOTAL OFF
REQUEST TOTAL OFF
CANCEL TOTAL OFF
EXECUTE TOTAL OFF
V
V
As the command procedure
of
“Load Off”
is finished the
“REQUEST TOTAL OFF”
screen appears again.