Chapter 3
Wiring
23
3. Connect the facility power cable (
Figure 21
). Use the provided 2-pin power terminal strip. If you are
using a heavier gauge cable, ensure that it is properly seated in the connector.
Figure 21. Power connection
When power is received by the housing board through the power connection, the housing board’s
diagnostic power LED will appear orange.
Содержание CyberDome II
Страница 1: ...g CyberDome II Installation Manual ...
Страница 4: ...CyberDome II Installation Manual iv ...
Страница 8: ...CyberDome II Installation Manual viii ...
Страница 26: ...CyberDome II Installation Manual 18 ...
Страница 42: ...CyberDome II Installation Manual 34 ...
Страница 56: ...CyberDome II Installation Manual 48 ...