12/120
EN
•
Close gas source shut off valve (cylinder or cylinder bundles) on the left hand side prior to
inlet connection I1.
•
Close shut-off valve V1.
•
SLOWLY open purge valve V3 to vent any excess gas within the high pressure hose.
•
Close purge valve V3 and disconnect high pressure hose from cylinders or cylinder bundles.
•
Replace empty cylinders with full ones.
•
Reconnect high pressure hose to cylinders or cylinder bundles. Use new gaskets, lubricate
with grease approved for high pressure oxygen up to 250 bar (like Gleitmo 595).
•
SLOWLY open gas source shut off valve and leak test joints with a leak detection fluid.
•
SLOWLY open purge valve V3 for 5 seconds to vent “AIR” within the high pressure hose.
•
Close purge valve V3.
•
Change the position of the lever L, to give normal operation to right-hand side (lever pointing
down), and open shut off valve V1 and read the full content of the new cylinders on the inlet
gauge M1. The alarm condition “Change of operating side” will hereby be cancelled.
•
The left hand side is now the reserve bank with full cylinders.
7.2.2. RIGHT HAND (RH) SIDE EMPTY
•
The inlet pressure gauge M2 on the right-hand side is indicating exhausted cylinders, so the
right-hand bank of cylinders needs to be replaced.
•
Close gas source shut off valve (cylinder or cylinder bundles) on the right hand side prior to
inlet connection I2.
•
Close shut off valve V2.
•
SLOWLY open purge valve V4 to vent any excess gas within the high pressure hose.
•
Close purge valve V4 and disconnect high pressure hose from cylinders or cylinder bundles.
O1
T3, T4
S1, S2
V5
R1
T1
M1
V3
V1
M3
V6
R2
M2
T2
V2
V4
T5
L
T6
P1, P2
F1
I1
E1
V10
F2
I2
Fig. 1
Содержание MM40
Страница 2: ......
Страница 16: ...16 120 EN Fig 6...
Страница 32: ...32 120 CS Obr 6...
Страница 48: ...48 120 FR Fig 6...
Страница 64: ...64 120 SV Fig 6...
Страница 81: ...81 120 ES Fig 6...
Страница 98: ...98 120 PL Fig 6...
Страница 115: ...115 120 NL Fig 6...