
ORCA-I Operation Manual
Operation
GBC Pro-Tech 1997 October
3-21
352&(66 &21752/ &+$57
Product:______________Process:_2-Pass Cold Mount/Cold Laminate (1
st
Pass) Date: _____
Material Top:_Pro-Gloss_______________Material Bottom:_Pro-Mount _________________
Other Material: ______________________________________________________________
CONTROL SETTINGS
Speed: 4-6 ft/min (1.2-2 m/min)
Reverse/Forward: Forward
Main Roll Up/Down: Down
Main Roll Pressure: 80 psi (550 kPa)
Top Heater On/Off: On
Top Temp. Set: 110 °F (45 °C)
Bottom Heater On/Off: Off
Bottom Temp. Set: --
Main Roll Shim Dials: --
Pull Roll Clutch On/Off: On
Pull Roll Clutch Pressure: 80 psi (550 kPa)
Pull Roll Up/Down: Down
Pull Roll Pressure: 60 psi (413 kPa)
Pull Roll Shim Dials: 3/16
Cooling: Off
See Diagram 3-6a for Webbing Outline
Special Instructions: __________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
EDNord - Istedgade 37A - 9000 Aalborg - telefon 96333500