
ORCA-I Operation Manual
Operation
GBC Pro-Tech 1997 October
3-15
352&(66 &21752/ &+$57
Product:__________________Process:_Encapsulation _________Date: ________________
Material Top:_3 Mil Gloss_______________Material Bottom:_3 Mil Gloss ________________
Other Material: ______________________________________________________________
CONTROL SETTINGS
Speed : 5-7 ft/min (1.5-2 m/min)
Reverse/Forward: Forward
Main Roll Up/Down: Down
Main Roll Pressure: 80 psi (550 kPa)
Top Heater On/Off: On
Top Temp. Set: 220 °F (104 °C)
Bottom Heater On/Off: On
Bottom Temp. Set: 220 °F (104 °C)
Main Roll Shim Dials: 0
Pull Roll Clutch On/Off: On
Pull Roll Clutch Pressure: 80 psi (550 kPa)
Pull Roll Up/Down: Down
Pull Roll Pressure: 80 psi (550 kPa)
Pull Roll Shim Dials: 0
Cooling: Optional
See Diagram 3-3a for Webbing Outline
Special Instructions: __________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
EDNord - Istedgade 37A - 9000 Aalborg - telefon 96333500