Page 5 - 8
Operations
F 60 H Operation and Maintenance Manual
© April 2001 General Binding Corporation
g) Measure the distance from the side frame to the
edge of the upper roll of film. Use this
measurement to evenly align the roll of mount
adhesive or craft paper.
C e n te r
Alig n
Unload film
a) Cut the roll of film from the web using an enclosed
blade.
N ever use an open blade near the lam inatin g
rollers. Y ou m ay cut the rollers or your self.
C A U T IO N
b) Lift up on the clevis pin to the unwind shaft located
in the unwind support saddle.
C le v is p in
U n w in d s u p p o rt s a d d le
c) Swing the unwind shaft out far enough to slide the
roll of film completely off.
W hen using tw o rolls on the m ach ine,
ensure the film w idths are identical.
E xposed adhesive can cause com p lications.
C A U T IO N
d) Swing the unwind shaft completely back into the
unwind support saddle and push the clevis pin
down.
C le v is p in
U n w in d s u p p o rt s a d d le