56
BOILER
1”
-
4”
K
Istruzioni originali—rev.2011—in accordo al 1.7.4 della direttiva macchine 2006/42/CE
G.B.C. Industrial Tools S.p.A.
Via Sandro Pertini 41/43 –
25046
Cazzago San Martino (Bs) –
Italia –
Tel. + 39 030 7451154 –
Fax. + 39 030 73 56 629
Remove the screws from the motor flange.
Hold the motor and pull it applying a little rotating movement until it comes off.
N.B.: While performing this operation ensure that the pinion remains in its seat.