32
BOILER
1”
-
4”
K
Istruzioni originali—rev.2011—in accordo al 1.7.4 della direttiva macchine 2006/42/CE
G.B.C. Industrial Tools S.p.A.
Via Sandro Pertini 41/43 –
25046
Cazzago San Martino (Bs) –
Italia –
Tel. + 39 030 7451154 –
Fax. + 39 030 73 56 629
Insert the elbow shaft in the machine and align its lap joint with the hole of the cover case where the two grub
screws should then be screwed back in.
Rotate the hand wheel in order to get the shaft inside the machine.