50
BOILER
1”
-
4”
K
Istruzioni originali—rev.2011—in accordo al 1.7.4 della direttiva macchine 2006/42/CE
G.B.C. Industrial Tools S.p.A.
Via Sandro Pertini 41/43 –
25046
Cazzago San Martino (Bs) –
Italia –
Tel. + 39 030 7451154 –
Fax. + 39 030 73 56 629
Assemble the reduction inside the locking device like you see here above
In replacement of the vane expansion nut you will need to screw the counter nut, and then the pneumatic
locking device as shown in the picture.