Operation
F-60+ Operation and Maintenance Manual
3-16
© GBC Pro-Tech 1999 April
352&(66&21752/&+$57$
Product: _________________ Process: Mount & Hot Overlaminate (First Pass) ___
Date: ________________
352&(66&21752/',$*5$0$
Mount and Hot Overlaminate (First Pass)
FRONT CONTROL SETTINGS
Speed: 0-6 fpm (0-180 cpm)
Reverse/Forward: Forward
Roll Pressure: 30-60%
Top Heater: 230 °F (110 °C)
Cooling: Optional
Bottom Heater: 32 °F (0 °C)
3 Mil
Gloss
Pro
Mount
Optional
Содержание 930-028
Страница 10: ...Safety F 60 Operation and Maintenance Manual 1 6 GBC Pro Tech 1999 April Blank page...
Страница 36: ...Operation F 60 Operation and Maintenance Manual 3 18 GBC Pro Tech 1999 April Blank page...
Страница 44: ...Warranty F 60 Operation and Maintenance Manual 5 2 GBC Pro Tech 1999 April Blank page...
Страница 46: ...Specifications F 60 Operation and Maintenance Manual 6 2 GBC Pro Tech 1999 April Blank page...