A
C
B
D
STEPS
1. ASSEMBLY OF MIDDLE ARCHES
Assembly of middle archesAssembler avec un autre coin d’arche (07-494) sur le côté droit. Insert the other
corner arch (07-494) on the right side. Take one completed arch; put screw 1 ¾” (O) through holes on the right
side, attach crossbar (06-368) over screw and tighten wing nut (Q). Repeat same procedures on the left side.
2. Repeat step 1 for the remaining middle arches.
3. ASSEMBLY OF END ARCHES
(Wing nuts are always on inside) See schema.
a) Take one arch (07-492); assemble with one end corner arch (07-491) on the left side.
b) Insert the other corner arch (07-491) on the right side.
c) Take one completed arch, put 1¾” screws (O) through holes on the right side, attach crossbar (06-368)
over screw and tighten wind nut (Q). Repeat same procedures on the left side.
d) Attach one end of door rail (06-373 – 07-495) to an end arch (07-491) with one screw 1 ¾” (O) and
wing nut (Q).
e) Slide the hooks (M) onto door rail, then install free end over screw 1 ¾” (O) and wing nut (Q) and tighten.
f) Repeat step 3 with the remaining arch.
g) Place one of the last arches assembled at the front of the shelter, the other at the back.
4. ASSEMBLY OF LEGS
a) Insert (07-489) legs into an end arch one side at a time.
b) Insert (07-490) legs into a middle arch.
c) Add middle arch to end arch using connecting pipes (06-371) and (06-374) with screws 3” (95-270),
and install diagonal bar (06-369) with screws 2 ½” (P) and with wing nuts (Q). See sketch at front page.
Note: (06-374) should be placed in an end section.
d) Repeat step b) and c) until the whole shelter is completed.
e) Verify that diagonal distances AD and BC are equal, and lengths AB and CD are equal.