
™
12.2
Lighting Schedule
1)
Set a new lighting schedule: After entering the strategy screen, click “Add Lighting Schedule.”
2) Set fixture strategy:
• Enter the name of the fixture strategy.
• Click the “Calendar” button to set the strategy start time.
• Select "Add Plan" on the right side of screen.
• Set the name of the schedule or delete the schedule; add additional phases for different growth cycles.
• Once the plan is created, click "Next" to go to the plan setup page.
3) Set schedule: From the schedule setting page, set brightness at different times to simulate sunrise and sunset. Time cycle
settings can also be added or deleted. View or edit each schedule’s brightness and time cycle from the schedule setting
homepage.
• Click on “Edit” to access the schedule settings.
• Click on “Edit Current Stage” to set the dimming profile of the selected stage.
• The current schedule can be turned on or off via Start Lighting Schedule or Stop Lighting Schedule.