![Gates Z3 Housing Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/gates/z3-housing/z3-housing_setup-use-and-care-manual_3762239037.webp)
Z3 Setup
Page 37
Changing the Port Base
Gates larger port series
– the 80 series – can be used with Z3. The 80 series port
system includes both SP80-8 in and SP80-10 in spherical diameter dome ports. This
can be useful in certain applications where the benefits of a larger dome are realized.
✓
Remove the 60-SERIES Port Base from Z3.
The four corner screws will release it
from the housing. Install the 80-SERIES Port Base, followed by an 80-SERIES Port
Ring and Port.
✓
Visually check the 80 Port Base o-ring
for damage or foreign material that may
compromise seal. Do the same with the mating surface on Z3 front shell.
✓
Next, install the taller feet on Z3.
This keeps the housing from resting on the larger
port system.
1. Remove four corner screws to
release the 60-SERIES Port Base.
Install the optional 80-SERIES Port
Base. Tighten screws snug.
2. Mount an 80-SERIES
Port Ring to the housing.
1/4 turn bayonet mount with
locking pins.
3. Mount an 80-SERIES Port to the
housing. Shown is the SP80-10 in
Dome Port. 1/4 turn bayonet
mount.
NOTE
– Two screws on left side
are sealing type screws. Verify
o-ring integrity before installing.
Содержание Z3 Housing
Страница 1: ...Z3 Housing Setup Use and Care Guide...
Страница 38: ...Z3 Setup Page 38 Install the taller feet...