Z3 Setup
Page 30
Functional System Check
Before the next step
– assembling Port Rings and Port – this is a good time to do a full
system check. Activate the Master System Power switch and verify all components
operational (see next section on controls for location of Master System Power and LCD
Power Switch (if installed).
✓
Z-CAM camera auto boot
✓
LCD boot
✓
Z3 internal housing cooling fan (which
you can feel pushing air left side of the
lens)
✓
Record Trigger functions
✓
GCC control (see control details in
next section)
✓
Focus and Zoom controls
When complete, power down the system with the Master Power Switch.
Содержание Z3 Housing
Страница 1: ...Z3 Housing Setup Use and Care Guide...
Страница 38: ...Z3 Setup Page 38 Install the taller feet...