background image

2.3.BOILER MAIN COMPONENTS 

F

İ

G 2

 

 

3. INSTALLING 

3- INSTALLING AND PLACEMENT 

1.Mounting the “B” Type Wall Hung Boilers with Flue Duct  

Caution: The mounting area and waste gas duct connection must conform the instructions 
designated by Turkish Standards Institute and authorized bodies. 

The wall hung boilers with flue ducts must not be mounted to areas with less than 8 m3 of 
volume and bedrooms, balcony, dusty environments, stairwells and random empty areas in 
the building. 

The waste gases that form due to combustion in wall hung boilers are exhausted by means of the 
flue duct. Since the use of such devices at areas with air inlets and flue ducts not conforming the 
specifications are dangerous for human life, the Gas Company does not permit the use of gas. 

1)

Air Pressure Switch

 

2) Het Exchanger 
3)

İ

onization electrod 

4) Condensate output 
5) Fan 
6) Motorized 3 Way Valve 
7) Domestic Water Heat Sensor HTC 
8) Safety Valves 
9) Domestic Water Flow Sensor

10) Flow sensor 
11) Pressure Safety Switch 
12) Pump 
13) Gas Valves 
14) Mixer 
15) Transformer of Burn 
16) Electrod of Burn 
17) Flame Monitoring Eye 
18) Sensor of chimney 

!

 

8

Содержание BAYKAN Series

Страница 1: ...ix 30kW Sun Premix 35kW Sun Premix Our highly esteemed customers We would like to thank you for your trust in our company Baykan and your decision for purchasing products of Baykan Our devices have be...

Страница 2: ...CONTENTS 1 WARNINGS PAGE 3 2 TECHNICAL DATA PAGE 6 3 INSTALLING PAGE 8 4 ADJUSTMENT AND MAINTENANCE PAGE 15 5 USAGE PAGE 19 2...

Страница 3: ...Bayklan Main Service Headquarters and Baykan Authorized Technical Services provide the installation adjustment and maintenance works of your wall hung boilers Your boiler has been manufactured for pur...

Страница 4: ...operate using electricity and gas Open the windows and doors Do not touch the electricity switches Do not smoke Immediately inform the Authorized Institution Your Local Gas Distribution Company and a...

Страница 5: ...International Directives and Regulations Your device is certified by Turkish Standarts Institute TSI Certificate Number Your device is CE certified CE Certificate Number The device is in conformity w...

Страница 6: ...temperature G20 20mbar 105 1 105 7 105 5 Class 107 2 107 5 107 5 Nox Type C 53 4 48 2 49 1 CENTRAL HEATING Central Heating System Water Temperatu Expansion Tax Capacity C 30 80 Expansion Tank Pressure...

Страница 7: ...NECTIONS Width mm 400 Height mm 700 Depth mm 330 362 394 Weight kg 37 39 41 CH circuit inlet outlet in DHW inlet outlet mm 60 100 Gas circuit m 90 Dirsek 3 5 Flue pipe diameter m 90 Dirsek 0 5 Flue pi...

Страница 8: ...in the building The waste gases that form due to combustion in wall hung boilers are exhausted by means of the flue duct Since the use of such devices at areas with air inlets and flue ducts not confo...

Страница 9: ...st not be mounted to areas with less than 8 m3 of volume and bedrooms balcony dusty environments stairwells and random empty areas in the building The waste gases that form due to combustion in wall h...

Страница 10: ...said spaces can be provided by keeping a wide space between door and floor EXAMPLEINDIRECT NATURAL VENTILATION EXAMPLE FOR AIR CIRCULATION THAT ARISES DUE TO THE DIFFERENCE OF DENSITY If air flow is...

Страница 11: ...surements given in the figure Hang your wall hung boiler to hanging screws 2 2 WATER AND GAS CONNECTIONS Before starting the procedures related with water connections we recommend you to wash the inst...

Страница 12: ...sure that the Gas pipe is clean clean around it The building internal gas distribution pipe must conform to the technical specifications and regulations An elastic connection between the device and in...

Страница 13: ...ot liable for the damages which may arise due to non standard electricity connection and grounding maps As electricity cables use NYM 3x1 5 mm2 Phase Neutral soiling Use a 3 Amper fuse CAUTION CONNECT...

Страница 14: ...LING THE WATER FOR CENTRAL HEATING SYSTEM After connecting electricity gas and water connections start filling the water for central heating system and circuit This procedure must be performed with ca...

Страница 15: ...the label ADJUSTMENT AND MAINTENANCE 1 ADJUSTMENTS CAUTION ALL PROCEDURES AND OPERATIONS DEFINED IN THIS SECTION OF THE MANUAL MUST BE PERFORMED BY QUALIFIED PROFESSIONALS APPARATUS ADJUSTMENT In ord...

Страница 16: ...unter clockwise MINIMUM CAPACITY Disconnect a connector of gas valve modulator meanwhile hold the nut shown with B still adjust the minimum pressure by tightening the screw A for increasing the pressu...

Страница 17: ...ion on the process card between 1 2 LPG circuits see figure nr 5 Ensure that the pressure on the boiler is min 25 and max 35 bars for butane gas and min 25 to max 37 mbar for Propane furthermore you s...

Страница 18: ...bstances that form due to burning MAINTENANCE WORKS Cleaning the growing coverings that may form on exchangers and electrodes Getting rid of the oxidation that may form on boiler Opening the device tu...

Страница 19: ...st be performed by qualified professionals The said person must check that the data on the plate and all adjustment elements and set ups are in conformity with the specified use of the device Always c...

Страница 20: ...r a long period of time turn off the main gas supply tap and cut the electricity leading to the wall hung boiler The wall hung boiler is controlled by a device against freezing on its control card the...

Отзывы: