background image

 

 

Have your maintenance provided by Baykan Authorized Technical Service staff and 

always use 

original spares. 

The Changes and Modifications that should not be performed on your wall hung 
boiler or around its location 

 

 

After putting your wall hung boiler into operation, never change the water, gas, air 

supply switches and electricity circuits. 

 

 

Do not attempt any modifications or changes on waste gas circuit. 

 

 

Do not attempt any modifications or changes on central heating circuit system, 

safety valve and exit pipe. 

The Precautions to Be Taken in the Case of Smelling Gas 

 

 

Gas inlet valve and the device must be turned off. 

 

 

Turn the devices which operate using electricity and gas. 

 

 

Open the windows and doors. 

 

 

Do not touch the electricity switches. 

 

 

Do not smoke. 

Immediately inform the Authorized Institution (Your Local Gas Distribution Company) and 

authorized people (Baykan Main Service Headquarters and Authorized Technical Service).(Gas 

Emergency Line:187) 

Explosive and Flammable Materials 

 Do not use explosive and flammable materials close to the location of your device and do not 

store them. (example: gasoline, paper paint and similar materials). 

Electricity Connection 

 The supply for your wall hung boiler must be 220V/50Hz and the supply cable must be 

connected to the earthed power socket. 

 The Maintenance of the Wall Hung Boiler 

 

 

Your device must be serviced at least once a year. 

 

 

The said service must be provided by Baykan Main Service Headquarters or 

Authorized Technical Services. 

!

 

4

Содержание BAYKAN Series

Страница 1: ...ix 30kW Sun Premix 35kW Sun Premix Our highly esteemed customers We would like to thank you for your trust in our company Baykan and your decision for purchasing products of Baykan Our devices have be...

Страница 2: ...CONTENTS 1 WARNINGS PAGE 3 2 TECHNICAL DATA PAGE 6 3 INSTALLING PAGE 8 4 ADJUSTMENT AND MAINTENANCE PAGE 15 5 USAGE PAGE 19 2...

Страница 3: ...Bayklan Main Service Headquarters and Baykan Authorized Technical Services provide the installation adjustment and maintenance works of your wall hung boilers Your boiler has been manufactured for pur...

Страница 4: ...operate using electricity and gas Open the windows and doors Do not touch the electricity switches Do not smoke Immediately inform the Authorized Institution Your Local Gas Distribution Company and a...

Страница 5: ...International Directives and Regulations Your device is certified by Turkish Standarts Institute TSI Certificate Number Your device is CE certified CE Certificate Number The device is in conformity w...

Страница 6: ...temperature G20 20mbar 105 1 105 7 105 5 Class 107 2 107 5 107 5 Nox Type C 53 4 48 2 49 1 CENTRAL HEATING Central Heating System Water Temperatu Expansion Tax Capacity C 30 80 Expansion Tank Pressure...

Страница 7: ...NECTIONS Width mm 400 Height mm 700 Depth mm 330 362 394 Weight kg 37 39 41 CH circuit inlet outlet in DHW inlet outlet mm 60 100 Gas circuit m 90 Dirsek 3 5 Flue pipe diameter m 90 Dirsek 0 5 Flue pi...

Страница 8: ...in the building The waste gases that form due to combustion in wall hung boilers are exhausted by means of the flue duct Since the use of such devices at areas with air inlets and flue ducts not confo...

Страница 9: ...st not be mounted to areas with less than 8 m3 of volume and bedrooms balcony dusty environments stairwells and random empty areas in the building The waste gases that form due to combustion in wall h...

Страница 10: ...said spaces can be provided by keeping a wide space between door and floor EXAMPLEINDIRECT NATURAL VENTILATION EXAMPLE FOR AIR CIRCULATION THAT ARISES DUE TO THE DIFFERENCE OF DENSITY If air flow is...

Страница 11: ...surements given in the figure Hang your wall hung boiler to hanging screws 2 2 WATER AND GAS CONNECTIONS Before starting the procedures related with water connections we recommend you to wash the inst...

Страница 12: ...sure that the Gas pipe is clean clean around it The building internal gas distribution pipe must conform to the technical specifications and regulations An elastic connection between the device and in...

Страница 13: ...ot liable for the damages which may arise due to non standard electricity connection and grounding maps As electricity cables use NYM 3x1 5 mm2 Phase Neutral soiling Use a 3 Amper fuse CAUTION CONNECT...

Страница 14: ...LING THE WATER FOR CENTRAL HEATING SYSTEM After connecting electricity gas and water connections start filling the water for central heating system and circuit This procedure must be performed with ca...

Страница 15: ...the label ADJUSTMENT AND MAINTENANCE 1 ADJUSTMENTS CAUTION ALL PROCEDURES AND OPERATIONS DEFINED IN THIS SECTION OF THE MANUAL MUST BE PERFORMED BY QUALIFIED PROFESSIONALS APPARATUS ADJUSTMENT In ord...

Страница 16: ...unter clockwise MINIMUM CAPACITY Disconnect a connector of gas valve modulator meanwhile hold the nut shown with B still adjust the minimum pressure by tightening the screw A for increasing the pressu...

Страница 17: ...ion on the process card between 1 2 LPG circuits see figure nr 5 Ensure that the pressure on the boiler is min 25 and max 35 bars for butane gas and min 25 to max 37 mbar for Propane furthermore you s...

Страница 18: ...bstances that form due to burning MAINTENANCE WORKS Cleaning the growing coverings that may form on exchangers and electrodes Getting rid of the oxidation that may form on boiler Opening the device tu...

Страница 19: ...st be performed by qualified professionals The said person must check that the data on the plate and all adjustment elements and set ups are in conformity with the specified use of the device Always c...

Страница 20: ...r a long period of time turn off the main gas supply tap and cut the electricity leading to the wall hung boiler The wall hung boiler is controlled by a device against freezing on its control card the...

Отзывы: