background image

IOM GMI 2M & 2ML Nov 2010.doc 

 

 

 

32

 

4.2 Troubleshooting 

 

 
Fault Cause 

Corrective 

Action 

 

Blower does not start 

 

Power not supplied to the unit. 

 
 
 

 

Safety loop open. 

 

 

 

 

 

 

 

None of the above 

 

Ensure power switch is on. 

 

Check both fuses on the power and the supply 
sides. 

 

 

Ensure BMS (if connected) calls for heat. 

 

Ensure high temperature limit switch is closed. 

 

Ensure maximum operating temperature switch 
is closed. 

 

Ensure low gas pressure switch is closed. 

 

 

See page 20 of the Riello catalogue for burner 
controller trouble shooting. 

 

Unit does not start 

 

Blower does not run. 

 

 

Air pressure switch installed 
on the housing is open. 

 
 

 

Gas pressure switch is open. 

 
 
 
 

 
 

 

 

No ignition. 

 

 

See above 

 

 

Adjust switch. 

 

Replace switch (if defective). 

 
 

 

Adjust the switch. 

 

Replace switch (if defective). 

 
 

 

See page 20 of the Riello catalogue for burner 
trouble controller trouble shooting 

 

Pilot flame failure 

 

Pilot gas valve not opened 

 
 
 
 

 

No ignition 

 

Check the electrical connections to ensure they 
are all securely connected (see the schematic 
wiring diagram for terminals). 

 

Check the two, safety shut off valves.  Replace 
if defective. 

 

 

Check the electrical connections to ensure they 
are all securely connected (see “Factory Wiring 
Diagram” on page 15 of the Riello catalogue) 
for terminals. 

 

Check the flame rod to ensure it is clean and 
free of any sedimentation.  Clean flame rod if 
necessary. 

 

Check the flame rod for any cracks or other 
defects.  Replace flame rod if necessary. 

 

Measure gas pressure in the pilot line at the exit 
test port of the second safety valve (downstream 
of the regulator).  Ensure it is within the 
specified 2”-5” wc.  If pressure is not available 
check both safety shut off valves and the 
pressure regulator.  Replace any defective 
component, if necessary. 

 

 

Main flame failure 

 

Main gas valve not opened. 

 
 

 
 
 
 
 
 

 

Check the electrical connections to ensure they 
are all securely connected. 

 

Check the two safety shut off valves.  Replace if 
defective. 

Содержание GMI 2M

Страница 1: ...smaster Industries 7480 MacDonald Road Delta British Columbia Canada V4G 1N2 GMI 2M GMI2ML 2 000 000 Btu hr Input Gas Fired Stainless Steel Boilers and Water Heaters INSTALLATION OPERATION AND MAINTEN...

Страница 2: ...View Dimensions 3 6 Side View Dimensions 3 7 Top View Dimensions 3 COMPONENTS DOCUMENTS MANUFACTURER COMPONENT SECTION Riello Catalogue 4 Honeywell Siemens Main Gas Valves 5 Asco Pilot Gas Valves 6 O...

Страница 3: ...eater Package 2 2 Location 2 3 Relief Valve 2 4 Water Connection 2 5 Condensate Line 2 6 Gas Line Connection 2 7 Vent Connection 2 8 General Instruction 14 15 15 16 16 16 17 20 SECTION 3 OPERATION 3 1...

Страница 4: ...ight1 lbs 1900 Supply Return Connections Water Content Inches USG 3 Stainless Steel Flange ANSI 150 lbs 41 0 Gas connection Inches 2 NPTF Gas inlet pressure Inches WC 8 to 14 Flue connection Inches 10...

Страница 5: ...eight1 Lbs 1950 Supply Return Connections Water Content Inches USG 4 Stainless Steel Flange ANSI 150 lbs 49 5 Gas connection Inches 2 NPTF Gas inlet pressure Inches WC 8 to 14 Flue connection Inches 1...

Страница 6: ...IOM GMI 2M 2ML Nov 2010 doc 6 SECTION 1 INTRODUCTION...

Страница 7: ...mber space outside the coils and within the liners and exit through the chimney The water flows in the opposite direction of gas Feed water enters the each coil at the perimeter of the heat exchanger...

Страница 8: ...n water reaches the LWCO position the burner should fire II Flame Sensor A Riello flame probe is used as a flame proving sensor This is connected to the burner controller and is installed inside the b...

Страница 9: ...established within 5 seconds of the ignition trial time the flame safeguard will shut off the pilot safety gas valves The pilot flame will ignite the air gas mixture flowing through the burner within...

Страница 10: ...ly at different site conditions calorific value of gas duct length etc After installation is completed using a gas analyzer the CO and O2 contents of the exhaust gases should be re checked to ensure t...

Страница 11: ...nstallation must conform to the requirements of the authority having jurisdiction or in the absence of such requirements to the National Fuel Gas Code ANSI Z223 1 latest edition All electrical wiring...

Страница 12: ...ydronic heating systems 1 8 Water Treatment All heat exchanger coils are constructed from high grade stainless steel Therefore high oxygen content in the feed water should not result in any corrosion...

Страница 13: ...IOM GMI 2M 2ML Nov 2010 doc 13 SECTION 2 INSTALLATION...

Страница 14: ...t manifold 8 Condensate drain connection 9 Flame sensor inside burner 10 Flue gas connection 11 Pressure Pressure temperature gauge 12 One purge valve installed at the inlet of each coil 13 All Safety...

Страница 15: ...bustion air can flow freely through to the air intake blower VIII A resilient pad to separate the boiler water heater from floor IS NOT REQUIRED 2 3 Relief Valve A pressure relief valve is supplied as...

Страница 16: ...iping guides developed according to local plumbing codes 2 5 Condensate Line Connect 3 4 ABS tubing from the condensate drain U trap directly to the floor drain Notice that the line MUST be pitched do...

Страница 17: ...ving jurisdiction In the absence of an authority the venting must comply with CSA B149 1 or ANSI Z223 1 Equivalent Lengths 90 deg Elbow 3 45 deg Elbow 2 Condensate Tee 2 Vent Cap 3 NOTES The exhaust v...

Страница 18: ...to the common venting system are not in operation I Seal any unused openings in the common venting system II Visually inspect the venting system for proper size and horizontal pitch and determine that...

Страница 19: ...t 21 mm m from the boiler to the vent terminal II The vent system should be installed to prevent accumulation of condensate III Where necessary the vent system must provide the means for drainage of c...

Страница 20: ...he boiler water heater and its gas connection must be leak tested before placing the boiler in operation 2 8 4 The boiler water heater when installed must be electrically grounded and bonded in accord...

Страница 21: ...owning Pregnant women should be cautious Soaking in water above 102 F 39 C can cause fetal damage during the first three months of pregnancy Pregnant women should respect the 100 F 38 C maximum rule B...

Страница 22: ...IOM GMI 2M 2ML Nov 2010 doc 22 SECTION 3 OPERATION...

Страница 23: ...tch This switch in the safety loop is installed at the end of manifold The switch is normally open and as soon as water level in the system reaches the point where the switch is installed it will clos...

Страница 24: ...start II Blower continues to run at its maximum frequency for a period identified as the purge time 3 1 3 Pilot Flame I After completion of the pre purge period the burner controller sends the requir...

Страница 25: ...ensor installed on the outlet manifold continuously measures the discharge water temperature Signals from this sensor are sent to the temperature controller If the temperature measured by the sensor i...

Страница 26: ...cordance with the design requirements Conduct a complete leak test on the unit s gas train and associated components Measure the static pressure upstream of the unit to ensure it is within the prescri...

Страница 27: ...ry jumpers have been removed from the unit s control panel If applicable ensure the external control connections have been wired NOTE Start up and commissioning MUST be carried out by a GMI qualified...

Страница 28: ...unit in operation measure the exhaust gas pressure inside the housing at the T connection located under the pressure switch V Test Points Measure gas line pressure upstream of the gas pressure regula...

Страница 29: ...he electrical supply to the pump Instead shut off the gas supply at a location external to the unit II Do not use this boiler water heater if any part has been under water Immediately call a qualified...

Страница 30: ...IOM GMI 2M 2ML Nov 2010 doc 30 SECTION 4 MAINTENANCE...

Страница 31: ...or the gas supply fails to shut off turn off the manual gas control valve IV Label all wires prior to disconnection when servicing the controls Wiring errors can cause improper and dangerous operation...

Страница 32: ...ilure Pilot gas valve not opened No ignition Check the electrical connections to ensure they are all securely connected see the schematic wiring diagram for terminals Check the two safety shut off val...

Страница 33: ...ing temperature switch Check all connections to and from the wiring block located immediately below the blower Check the maximum heat requirement with the engineer and ensure the unit is of the approp...

Страница 34: ...IOM GMI 2M 2ML Nov 2010 doc 34...

Страница 35: ...IOM GMI 2M 2ML Nov 2010 doc 35 START UP REPORT...

Отзывы: