IOM GMI 2M & 2ML Nov 2010.doc
11
1.5 Gas Manifold and Control Assembly Tests
Safe operation and all performance criteria of all Gasmaster products, incorporating the installed
gas manifold and control assembly, are proven before delivery when the products are factory
tested in accordance with the ANSI Z21.13b 2000 standards.
1.6
Code Compliance
In Canada, boiler installation must conform to the requirements identified in the CGA Codes
CAN1-B149-1 or CAN1-B149-2 for gas burning appliances, CSA Codes B51 for boiler, pressure
vessel, and pressure piping, and/or all applicable local codes. All electrical connections are to be
made in accordance with the requirements of CSA C22.1, Canadian Electrical Code, Pat 1, and/or
all applicable local codes.
In the United States of America, the installation must conform to the requirements of the authority
having jurisdiction or, in the absence of such requirements, to the National Fuel Gas Code, ANSI
Z223.1-latest edition. All electrical wiring must be carried out in accordance with the National
Electrical Code ANSI/NFPA No.70-latest edition, and any additional state or local code
requirements. If an external power source is used, the unit must be electrically grounded in
accordance with the requirements of the authority having jurisdiction. In the absence of such
authority, the boiler must be electrically grounded in accordance with the National Electrical Code
ANSI/NFPA No. 70-latest edition.
The plumbing and condensate disposal must be carried out in accordance with the local plumbing
codes.
NOTES
¾
Boiler/water heater can be used in both closed loop and open loop
(one pass) operations.
¾
In the commonwealth of Massachusetts the installation shall be
carried out by a licensed gas fitter/plumber and comply with
48CMR
Содержание GMI 2M
Страница 6: ...IOM GMI 2M 2ML Nov 2010 doc 6 SECTION 1 INTRODUCTION...
Страница 13: ...IOM GMI 2M 2ML Nov 2010 doc 13 SECTION 2 INSTALLATION...
Страница 22: ...IOM GMI 2M 2ML Nov 2010 doc 22 SECTION 3 OPERATION...
Страница 30: ...IOM GMI 2M 2ML Nov 2010 doc 30 SECTION 4 MAINTENANCE...
Страница 34: ...IOM GMI 2M 2ML Nov 2010 doc 34...
Страница 35: ...IOM GMI 2M 2ML Nov 2010 doc 35 START UP REPORT...