IOM GMI 2M & 2ML Nov 2010.doc
26
3.2 PRE-COMMISSIONING
I:
Water connections (Return and Supply Lines)
¾
Purge air from the piping system, and from the boiler/water heater.
To purge the unit, close 4 of the twelve purge valves and run water through the
open coil for at least five minutes. The coil is now completely purged. Repeat
the process for the remaining 4 coils, until all 5 coils are completely purged.
II:
Gas Connections
¾
All pipe connections should be carried out in strict compliance with all
applicable local codes.
¾
Selection of the gas regulator model and size should be carried out in
accordance with the design requirements.
¾
Conduct a complete leak test on the unit’s gas train, and associated components.
¾
Measure the static pressure upstream of the unit to ensure it is within the
prescribed range of 8” - 14 ” wc.
III:
Vent Connection
¾
Installation must be carried out in accordance to all applicable local codes and
factory guidelines.
¾
When required, a proper drain should be installed on the vent.
IV:
Condensate Line Connection
¾
Inspect the condensate line and ensure it is installed in accordance with the
factory guidelines.
NOTE
¾
If as a result of mal-functioning of the temperature controller
the discharge water temperature increases above that of the
high limit temperature switch, the unit will automatically shut
down and will not re-start until said switch is manually re-set.
Содержание GMI 2M
Страница 6: ...IOM GMI 2M 2ML Nov 2010 doc 6 SECTION 1 INTRODUCTION...
Страница 13: ...IOM GMI 2M 2ML Nov 2010 doc 13 SECTION 2 INSTALLATION...
Страница 22: ...IOM GMI 2M 2ML Nov 2010 doc 22 SECTION 3 OPERATION...
Страница 30: ...IOM GMI 2M 2ML Nov 2010 doc 30 SECTION 4 MAINTENANCE...
Страница 34: ...IOM GMI 2M 2ML Nov 2010 doc 34...
Страница 35: ...IOM GMI 2M 2ML Nov 2010 doc 35 START UP REPORT...