-10-
4. Next assemble the bridge-support for the tanks (Pos. 4, Image 1) using the 4 screws and 4 cap
nuts.
5.
Next attach the air outlet unit. Introduce the air outlet elbow (Pos. 1, Image 31) into the
corresponding hole and, after this, attach the air outlet mouth (Pos. 2, Image 3) slightly angled
towards the battering area.
Image 3. Initial assembly 2
6.
After this, attach the two upper tanks (Pos. 5, Image 1) along with the batter stirring unit.
7. Next, attach the batter tank (Pos. 6, Image 1), supporting it on its support and letting it slide until
its boss enters the attaching hole.
8. The next step is to assemble the batter belt (Pos. 7, image 1). Support it on the bread tank, fitting
it into place and fixing it with two knobs (Pos. 31. overview).
9. After this, fit the batter roller (Pos. 8, Image 1), introducing it into the guides in the batter belt.
10. Finally, fit the valves (Pos. 3, Image 3) into the batter tank (Pos. 59, overview) and the batter tank
(Pos. 45, overview).
11.
As an option, the machine can also be supplied with the excess bread blower module (Pos. 9,
Image 1). This can be fitted once the breader unit and tanks have been fitted. No knob is required
to attach it. It is centred by two pivots (Pos. 33, overview) mounted on the chassis of the breader
belt (Pos. 32 overview).
Содержание PRACTIC 350
Страница 1: ...AUTOMATIC BATTER BREADING MACHINE Mod PRACTIC 350...
Страница 22: ...22 Figure 3 General overview 3 Figure 4 General overview 4...
Страница 23: ...23 Figure 5 General overview 5...
Страница 40: ...40 Figure 21 Electrical cabinet overview 1 Figure 22 Electrical cabinet overview 2...
Страница 42: ...42 12 WIRING DIAGRAMS...