4 – INSTALLATION
4.1 – CHECKING SYSTEM INTEGRITY
Before installing the pressure regulator it’s necessary to insure that:
1) The equipment are in perfect conditions or has evidences of damage during the transport, in case of
perceptible damage in the equipment do not proceed with installations and get in contact with GASCAT.
2) The space provided for the acess and installation of equipment is appropriate, including future maintenance.
3) The installation was designed to support the load imposed by the equipment.
4) The inlet and outlet pipe connections are in the same level.
5) All connections for sense line and discharge line requested by the model of pressure regulator are arranged in
the pipeline and respect the dimensions provided by manufacturer.
6) Was arranged pressure indicators at the inlet and outlet of the pressure regulator to insure the correct
adjustment of set point during the commissioning.
7) Was arranged a vent line between the pressure regulator and the first block valve in the outlet of stream to help
the operator during the start-up.
8) Check the flow direction in the valve body and pay attention in the installation to assure that the valve are in the
correct position.
4.2 – PRESSURE REGULATOR NAMEPLATE
Before installation, checking is recommended to ascertain that the conditions of use are in conformity with the
specifications of the equipment. These specifications are recalled with the symbols on the plate fitted on pressure
regulator.