MDE-4319A TopKAT Fuel Managment System Installation Manual · November 2005
Page 113
Port Communication Wiring
Series 9800 Field Installation
Port Communication Wiring
The following diagrams show the pin-to-pin layout of the possible wiring schemes for the
TopKAT ports. Each port may be wired for any of the wiring schemes provided the
installation requirements are met as outlined in
“Communication Requirements” on page 17
.
Figure 8-4: RS-232 - D Connector
Note: In the TopKAT, the green connector goes to P4 on the communication board for port 2
and P6 for port 3. The K1 & K2 jumper for the port being used should be set to RS-232.
See
“Terminal Block ID” on page 26
for the location of K1 & K2 jumpers.
Содержание TopKAT
Страница 1: ...TopKAT Fuel Management System Installation Manual MDE 4319A formerly C35754...
Страница 141: ......