GARO LS4 43kW Скачать руководство пользователя страница 14

XD1

PE

N

L1

L2

L3

RFID 1

EB1

100W

Ant.

+

-

DC Terminal

AC Terminal = AC Terminal Block 230V

T1 = Powersupply 12V/230V

K3 = Contactor for Heater Cold Option

RFID 1 = RFID Reader

KF1 = Led light Topcard

ANT = 4G antenna

Components Placement (Read from top to bottom)

CC1 = Charge Controller (Master)

P1 = Energymeter

XD1 = Type2 Charging Cable

DC Terminal = DC Terminal Block +12V/-12V

XN1= Neutral Terminal Block
QA1 = Contactor
XPE1= Protection Earth Terminal Block 1
XPE2= Protection Earth Terminal Block 2
CT1 = Current transformer 100A
CT2 = Current transformer 100A
CT3 = Current transformer 100A
FC3 = Fuse Charge Controller and Powersupply
FC1 = Fuse
FB1 = RCCB
200/201 = External Meter Terminal  Block 200/201
Q1 = Main Breaker
SP1 = Surge Protection
EB1 = Heater Cold Option
X1 = Incoming Terminal Block

X1

CC

1

-QA1

XN1

230V

12V

T1

K3

AC Terminal

CT1

CT2

CT3

P1

-XD1

XP

E1

XPE2

FB1

FC1

0

1

20

1

20

0

FC

3

SP1

Q1

-KF1

ELECTRICAL DIAGRAM

ELECTRICAL DIAGRAM

14

EN

Содержание LS4 43kW

Страница 1: ...GARO LS4 43kW Installation Manual EN GARO AB Box 203 SE 335 25 Gnosj Phone 46 0 370 33 28 00 info garo se garo se Manual 380316 1 0 EN...

Страница 2: ...utions 4 General Information 4 Content 4 INSTALLATION 5 NORMAL USE 9 Electrical diagram 14 Technical specifications 17 Service information 17 Form for annual service and maintenance 18 Warranty Condit...

Страница 3: ...FETY INFORMATION The LS4 stations are designed exclusively for charging electric vehicles All installation must be carried out by an authorized installer and comply with local country installation reg...

Страница 4: ...er behind the front door When contacting GARO support please have the M number available LS4 stations that are pre configurated for backend solution have the ChargeBoxID CBID labeled under the M numbe...

Страница 5: ...the provided ethernet router switch located ie in the LS4 master Se example of ethernet wiring diagram picture 6 7 In cases with LS4 stations connected in a grid installation of the LS4 stations need...

Страница 6: ...picture 1 picture 2 Cu 2 5Nm Al 4Nm OPTION INSTALLATION CU AL 6 EN...

Страница 7: ...0 8Nm 0 05 picture 3 picture 4 picture 5 INSTALLATION 7 EN...

Страница 8: ...P CAT6 cable to router switch 5pcs LS4 connected with TP CAT6 cable to router switch picture 6 picture 7 Example of DLM meter installation Modbus address 2 9600 8 1 no parity Terminals 200 A 201 B DLM...

Страница 9: ...ing station have received command from backend to start charging and is waiting for car to connect Firm Car connected Charging is ongoing state C Car connected Charging is paused state B Blinking When...

Страница 10: ...g without success Contact installer or GARO Support please have M number available Check car settings that can influence charging i e gear in parking mode doors closed car locked etc Present a valid R...

Страница 11: ...kend charger configuration OperatorCurrentLimit Check motor locking wiring and connection for damages Verify that locking mechanism rod and arm are not stuck Verify that the connector is properly inse...

Страница 12: ...black cables were disconnected then it has deteced an earth fault in one of the DC powered components controllers upper PCB router switch etc inside the charging station If LED light DC OK remains tu...

Страница 13: ...Vehicle not connected Firm CHARGING occupied C Vehicle connected ready CHARGING suspendedEV B Vehicle connected not ready Blinking Reserved Firm RCD triggered groundFailure Residual current detected...

Страница 14: ...XN1 Neutral Terminal Block QA1 Contactor XPE1 Protection Earth Terminal Block 1 XPE2 Protection Earth Terminal Block 2 CT1 Current transformer 100A CT2 Current transformer 100A CT3 Current transforme...

Страница 15: ...CT3 XPE2 XPE1 P1 CC1 A MOD CC1 B MOD AC Terminal 35 Feritte 525 Ohm DOUBLE INSULATED CABLE 16 1 5 XN1 L N EB1 Heater Cold Option 10A FC3 I 2 1 P1 11 P1 11 XD1 CP 201 200 External Energy Meter A1 A2 Q...

Страница 16: ...o t o M Motor HS1 Relais 13 Motor HS2 Relais 14 GND2 Modbus B2 Modbus A2 Modbus WA Relais 23 WA Relais 24 RJ45 CC1 Down Side 0V 12V DC Terminal A1 A2 K3 OUT IN OUT IN CC RFID 12V GND HEAT Top Card KF1...

Страница 17: ...ID output power 250mW SERVICE INFORMATION Care and maintenance GARO charging station LS4 The warranty will only remain valid if service is performed Service is performed once a year and must be docume...

Страница 18: ...cation by 2 or 3 flashes from LED s Turn off the electrical power Check gaskets Check torque for mains terminals Check torque for LS4 fixing screws towards ground wall Check torque on standard compone...

Страница 19: ...l number 7 Warranty does not cover damage occurred by incorrect use of equipment use of any non original spare parts lack of maintenance or faults caused by disassembly of the product or unauthorized...

Страница 20: ...ANTIFORMUL R LS4 Model M no Electrical installation data Group fuse A Supply cable dimension Function Test Testbox EV model Date Sign Installer Company Name Owner Customer Name Installation adress WAR...

Страница 21: ...DECLARATION OF CONFORMITY 21 EN...

Страница 22: ...GARO AB Box 203 SE 335 25 Gnosj Phone 46 0 370 33 28 00 info garo se garo se EN...

Отзывы: