Firm
If the orange "alarm" LED indicator on the charge controller is firm
lit, then the charge controller needs to be replaced.
Have you tried everything
without success? Contact
installer or GARO Support
(please have M-number
available)
Firm Red light will always
generate an alarm to the
backend operator.
Reset the RCCB inside the charging station.
Verify that the 8-pole quick connection on the charge controller is
properly connected.
Verify correct grounding and phases in building electrical system
When car is connected: Disconnect charging cable from the
charging station, then the LED indication shall return to GREEN.
Reconect charging cable to start charging. The charging
will restart automatically after 15 minutes if cable is not
disconnected.
Reset circuit breaker.
Check internal wiring and components for possible reasons for
short circuit.
Verify allowed maximum current in backend charger configuration
(OperatorCurrentLimit).
Check motor locking wiring and connection for damages. Verify
that locking mechanism rod and arm are not stuck.
Verify that the connector is properly inserted into the socket. Light
force may be applied.
Verify that there are no foregin objects inside the socket outlet,
hence blocking the connector.
Verify that the motor locking is properly installed and without
visual damages.
Check charging cable and connectors for damages. Test with
another cable if available.
Verify that CP and PP connection pins and wires are not loose or
having bad connection.
Verify grounding of charging station.
Firm (3 seconds)
Verify that the RFID token is approved by backend (contact
backend operator).
Have you tried everything
without success? Contact
installer or GARO Support
(please have M-number
available)
Verify that the RFID token is stored in charger internal memory /
whitelist (requires certified technician)
Blinking
Contact backend operator and ask for remote activation.
Blinking
No error
LED light indication Measure 1
Measure 2
USER INSTRUCTIONS
11
EN
Содержание LS4 43kW
Страница 6: ...picture 1 picture 2 Cu 2 5Nm Al 4Nm OPTION INSTALLATION CU AL 6 EN...
Страница 7: ...0 8Nm 0 05 picture 3 picture 4 picture 5 INSTALLATION 7 EN...
Страница 21: ...DECLARATION OF CONFORMITY 21 EN...
Страница 22: ...GARO AB Box 203 SE 335 25 Gnosj Phone 46 0 370 33 28 00 info garo se garo se EN...