a. TN system.
b. IT system.
2. Install the wires to the terminal block.
a. If the wires have strained conductors (A), use a
flat screwdriver and push the orange button to
open the terminal.
b. If the wires have cable ferrules (B) or solid
conductors (C), push the wires into the terminal.
3. To remove any wire, push a flat screwdriver on the
terminal and pull the wire out.
PE
L2
PE
18 mm
18 mm
A
B
C
18 mm
29
Содержание ENTITY PRO
Страница 1: ...GAROEntityProinstallationand operation GARO Entity Pro installation and operation...
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 74: ......
Страница 84: ......
Страница 90: ......
Страница 91: ...EC DECLARATION OF CONFORMITY 91 EC Declaration of conformity...