GHP 10V Installation Instructions
19
GHP 10V Installation Checklist
Detach this checklist from the installation instructions and use it to assist with the GHP 10V installation process.
Read all installation instructions before installing the GHP 10V. Contact Garmin Product Support if you have any questions during the installation
process.
1. Refer to the diagram and notes starting on
to understand the necessary electrical and data connections.
2. Lay out all of the components first. Check the cable lengths. Obtain extensions if necessary.
3. Mount the CCU by following the directions starting on
. Mount the CCU in a location free of magnetic interference. Use a
handheld compass to test for magnetic interference in the area.
Mount the CCU in the bracket so that the wires hang straight
down
.
4. Mount the GHC 10 by following the directions starting on
5. Mount the Autopilot Gateway by following the directions on
.
6. Connect the Autopilot Gateway to the Volvo multilink bus (
7. Connect the Autopilot Gateway to the CCU using the CCU interconnect cable (
page 8).
8. Connect the GHC 10 and the CCU to a NMEA 2000 network. Connect an optional NMEA 2000-compatible GPS device to the NMEA
2000 network (
page 9).
9. Connect the yellow wire on the GHC 10 data cable to the yellow CCU signal wire on the CCU interconnect cable and the black
wire on the GHC 10 data cable to CCU ground. Connect an optional NMEA 0183-compatible GPS device to the GHC 10 if a
NMEA 2000-compatible GPS device is not available (
).
10. Configure the GHP 10V system by completing the Sea Trial Wizard (