RB-7-100 Page 20
AEON PD Synthetic Lubricant should be drained after 6000 hours of operation. Re-fill with fresh AEON PD oil. If
mineral oil is used, perform the above oil change maintenance every 1500 hours. Recommended service
intervals are for normal blower operating conditions. Severe operating conditions may warrant more frequent oil
changes. Laboratory analysis of lubricant should be used to help determine the optimum oil change interval.
For best performance and equipment protection, use AEON PD Synthetic Lubricant, which has been specifically
formulated for positive displacement blowers.
NOTICE
Flush the oil whenever a change is made from one type of oil to another.
Drain the current lubricant as thoroughly as possible. Refill with the new lubricant. Fill to normal level of the
blower, which is at the middle of the sight glass when the machine is not operating. Run the blower for one hour.
Shut off the blower and drain the lubricant completely. Refill the blower again with the new lubricant.
Содержание RBS 15
Страница 1: ...PARTS LIST OPERATING AND SERVICE MANUAL RBS BLOWERS Models RBS 15 225 RB 7 100 Version 02 May 05 2017...
Страница 2: ......
Страница 16: ...RB 7 100 Page 15 RBS OVERHUNG LOAD...
Страница 26: ...RB 7 100 Page 25 SECTION 5 MAINTENANCE FIGURE 5 1 MAINTENANCE CHECK LIST...
Страница 29: ...RB 7 100 Page 28 SECTION 7 PARTS LIST 7 1 RBS 15 25 Sectional drawing FIGURE 7 1...
Страница 31: ...RB 7 100 Page 30 7 2 RBS 35 106 Sectional drawing FIGURE 7 2...
Страница 34: ...RB 7 100 Page 33 7 3 RBS 115 225 Sectional drawing FIGURE 7 3...
Страница 37: ...RB 7 100 Page 36 OVERHAUL KIT...
Страница 38: ...RB 7 100 Page 37...
Страница 39: ...RB 7 100 Page 38...
Страница 41: ......