background image

 

3-1-618    Page 36 

   

 

 

 

 

 

 

Product Warranty 

BE-13 R 02/2003, Copyright © 2003 Gardner Denver, Inc. 

 

 
GENERAL PROVISIONS AND LIMITATIONS 

Gardner Denver (the "Company") warrants to each original retail purchaser ("Purchaser") of 

its new products, assemblies or parts from the Company or its authorized distributors that such 
products are, at the time of delivery to the Purchaser, made with good material and 
workmanship.  No warranty is made with respect to: 

 

1.  Any product which has been repaired or altered in such a way, in the Company's 

judgment, as to affect the product adversely. 

2.  Any product which has, in the Company's judgment, been subject to negligence, 

accident, or improper storage, improper installation, operation or application. (Examples: 
over-pressure, sand-outs, cavitation, corrosion, erosion or degradation). 

3.  Any product which has not been operated or maintained in accordance with the 

recommendations of the Company. 

4.  Components or accessories manufactured, warranted and serviced by others. 
5.  Any reconditioned or prior owned product. 

 

Claims for items described in (4) above should be submitted directly to the manufacturer. 

 

WARRANTY PERIOD 

The  Company's  obligation  under  this  warranty  is  limited  to  repairing  or,  at  its  option, 

replacing,  during  normal  business  hours  at  an  authorized  service  facility  of  the  Company,  any 
part  or  assembly  which  in  the  Company’s  judgment  proved  to  have  unsatisfactory  material  or 
workmanship within the applicable Warranty Period as follows. 

 

Except for the products or components listed below, and subject to the limitations and 

restrictions set forth in the “Disclaimer” section set forth below, the Warranty Period for all 
products is 1,250 hours of operation or three (3) months after start-up, not to exceed 120 days 
after delivery to Purchaser, whichever occurs first.  The exceptions are as follows: 

1.  Power end is warranted for twelve (12) months from date of start-up or eighteen (18) 

months from date of delivery to the Purchaser, whichever occurs first. 

2.  Forged steel fluid cylinders are warranted for materials and workmanship for 6 months 

from the date of installation or 18 months from the date of delivery to the purchaser, 
which ever occurs first. 

3.  Repairs are warranted for 90 days from the date of delivery, for the workmanship and 

materials of the new parts installed.   

4.  Weld repaired fluid ends and weld repaired components are not warranted. 
5.  Expendable fluid end parts, including, but not limited to, valves, valve parts, packing, 

liners and pistons, are not covered by this warranty due to variable abrasive nature of 
material pumped.

 

 

PRESERVATION ASSEMBLIES DESTINED FOR STORAGE  

In order for warranty acceptance any pump assembly not immediately installed or destined to 

be in storage or in transit for extended periods of time must be prepared for storage as

 

defined in 

the Company’s Long Term Storage Procedure.  This includes but is not limited to: 

 

  Drain and thoroughly clean inside power end crankcase. 

  Spray rust inhibiting oil on all bearing, machined and inside surfaces of the power end. 

  Induce clean gear oil into any circulating pump, filter, heat exchanger and piping. 

  Remove valves, seats and plungers from the fluid end.  Thoroughly clean and dry these parts 

and all internal surfaces.  Coat all cylinder bores, valve covers and reusable expendable parts 
with rust preventative. 

  Flush all water, and contaminants from pump, tanks, hoses and spray nozzles.  Spray all 

components with a rust inhibiting oil. 

  Rotate pump every 30 days to insure bearings are oiled.  

  At the expense of the Purchaser, any product properly preserved must be inspected by an 

 

authorized agent of the Company, prior to the Company, granting any extended warranty 

 

beyond that stated in this warranty. 

Содержание GD-3000

Страница 1: ...ECN 1058968 GARDNER DENVER 3 1 618 Revision D April 2011 WELL SERVICING PUMP MODEL GD 3000 OPERATING AND SERVICE MANUAL...

Страница 2: ...in pump maintenance and repair They are ready to respond and assist you by providing fast expert maintenance and repair services For the location of your local authorized Gardner Denver distributor r...

Страница 3: ...peration and minimal downtime DANGER Danger is used to indicate the presence of a hazard which will cause severe personal injury death or substantial property damage if the warning is ignored WARNING...

Страница 4: ...Ordering Repair Parts i Foreword ii Index iv List of Illustrations v Section 1 Danger Notices 1 Section 2 Design Description and Specifications 9 Section 3 Preparation Operation and Maintenance 15 Se...

Страница 5: ...ly Routine Maintenance Schedule 19 Oil Stop Head Seal Retainer and Crosshead Guide End Plate 24 Ordering Instructions Repair Parts i Performance Rating 14 Periodic Routine Maintenance Schedule 18 Plun...

Страница 6: ...2 GD 3000 Power End 10 Figure 2 3 GD 3000 Power End Top View 11 Figure 2 4 GD 3000 Gear Reduction Unit 12 Figure 2 5 GD 3000 Fluid End 13 Figure 3 1 Lubricant Recommendations 17 Figure 4 1 Tightening...

Страница 7: ...begin or continue operations when tired distracted or under the influence of alcohol or any type of prescription or nonprescription drugs The timely replacement of expendable parts and any other worn...

Страница 8: ...e they have safe footing Fully engage the wedge to prevent it from disengaging violently from the cover as a blow is struck Wipe their hands and the hammer handle and maintain a firm grip on the handl...

Страница 9: ...nnected to the lifting attachments normally built into the package unit support skid Packages too large to lift as fully assembled should be separated into smaller loads For these smaller loads the li...

Страница 10: ...f pressure Any pipe line used to direct pressurized relief flow to another location such as a collecting tank is not blocked The discharge system is not blocked and all the discharge line valves are o...

Страница 11: ...trols are clearly tagged with warnings not to start the pump while repair work is in process Whenever the pump is operating continually monitor the entire suction discharge and pump lubricating system...

Страница 12: ...eration and stop ongoing operation if flammable or explosive vapors are detected Hot surfaces sparks electric current or engine exhaust could ignite flammable or explosive vapors Each engine used as a...

Страница 13: ...damage The operators should take frequent rest breaks and cease operations when they become tired or distracted Before the equipment is started the work area must be inspected and properly prepared t...

Страница 14: ...quality of design construction and safety since these components are among the most critical to the safe operation of high pressure liquid jetting blasting and cleaning equipment After you have selec...

Страница 15: ...r software developed by American Gear Manufacturers Association The issue of personnel safety is the most important topic covered in this manual Therefore in the beginning of this manual the user is i...

Страница 16: ...ques presents information useful for pump rebuilding and assembly including dimensional and tolerance data running clearances for all bearings and recommended fastener torques PUMP DESIGN The GD 3000...

Страница 17: ...kle joint design is essentially standard but utilizes a large knuckle 7 and crosshead 13 5 thus allowing extremely high rod load 350 000 lbf See FIGURE 2 3 Also the pump has a drain pan to collect the...

Страница 18: ...n the bottom of the frame in the center cylinder Oil passages at the forward part of the frame members allow the end cylinders to drain to the center Oil is also drained from three 1 crosshead drains...

Страница 19: ...olt nuts The conventional valve over valve configuration offers field proven arrange ment in terms of valve and spring performance Improvements in the fluid end life come from increasing fluid cylinde...

Страница 20: ...10 49 13 12 22 007 5 11 19 635 0 065 3 62 4 54 5 68 6 72 8 44 10 52 12 96 16 20 17 825 5 5 11 23 758 0 078 4 38 5 49 6 88 8 13 10 21 12 73 15 68 19 60 15 000 5 75 11 25 967 0 086 4 79 6 00 7 52 8 89 1...

Страница 21: ...ges 5 Remove the breather and either plug or tape the opening 6 Coat the gear reducer input shaft and all extension rods with a heavy rust preventive 7 Plug drain holes at the bottom of the pump frame...

Страница 22: ...nts In the past failure to meet these requirements has lead to pump damage because of restricted oil flow in the lube pump inlet Therefore the following guidelines developed as a result of long experi...

Страница 23: ...o the volume to be pumped by the triplex pump so that there is no less than 40 psi charge when the triplex pump operates at its maximum flow The first startup and several hours of the pump run in are...

Страница 24: ...pressure rating for 30 minutes 11 During this time observe the suction vacuum gage reading oil pressure and temperature and check for leaks 12 Run the pump at 80 90 strokes per min at the following l...

Страница 25: ...perform these tasks 4 Listen for any abnormal noise or rough operation which may indicate the need for fluid end maintenance such as changing valves or valve seats Due to very high pressures in the t...

Страница 26: ...ps Petroleum EP 500 Summer or EP 300 Winter 10 F Shell Oil Co Torcula Oil 32 50 F Torcula Oil 100 20 F Torcula Oil 150 15 F Torcula Oil 320 10 F Sun Oil Co Rockdrill 500 Light 5 F Rockdrill 1000 Heavy...

Страница 27: ...ile working on pump FLUID END SERVICE This discussion starts with the description of steps necessary for removal and installation of the fluid cylinder assembly and proceeds to the removal and replace...

Страница 28: ...nger clamps piping connections and auxiliary equipment FIGURE 4 1 Tightening Sequence for Fluid End Nuts Plunger and Packing Replacement This service procedure can be performed with the fluid cylinder...

Страница 29: ...nt twisting while loosening the stuffing box 4 Loosen the stuffing box using the stuffing box wrench 5 Carefully remove the stuffing box from the cradle area 6 Clean and oil the packing bore in the st...

Страница 30: ...ng the engine inadvertently The power end service procedures deal first with major assemblies namely crosshead connecting rod crankshaft and knuckle joints and then describe how to access all individu...

Страница 31: ...ice to the thread of the crosshead front half and lift off 14 Remove the thrust bearing 15 Remove the snap rings from the wrist pin 16 Remove the wrist pin while supporting the crosshead back half 17...

Страница 32: ...the crankshaft from disengaging with the frame see Special Tools section of Parts Manual 8 Move the gearbox and the splined adapter to the service area Crankshaft Assembly 1 Remove the pump from the...

Страница 33: ...he right side of the frame and the left end bearing and center left bearing out the left side of the frame 17 With bearing locks removed bearings may be driven out of bore with a hammer and brass or a...

Страница 34: ...3 Clogged suction line 3 Clean out line 4 Suction and or discharge 4 Remove the obstruction valves propped open Low Discharge Pressure 1 Worn or fluid cut valve 1 Replace valve assembly 2 Valve proppe...

Страница 35: ...settling time in supply tank Reduce pump speed 10 Air entering suction line 10 Repair suction line 11 Air entering charging pump 11 Tighten or replace shaft packing or seal 12 Air entering or charge...

Страница 36: ...ise transmitted to 11 See Excessive Valve power end Noise problem 12 Cavitation noise transmitted 12 See Cavitation Fluid to or causing shock loading in Knock or Hammer problem power end Excessive Val...

Страница 37: ...and sealing surface 4 Corrosion due to wrong 4 Determine and install correct stuffing box material stuffing box for pumped fluid 5 Stuffing box bore worn 5 Replace stuffing box Pumped Fluid In 1 Worn...

Страница 38: ...ons Customer Service 5 Wrong size packing 5 Install correct size packing 6 Improper packing installation 6 Check installation procedure and install correctly 7 Excessive crosshead wear 7 Replace cross...

Страница 39: ...r Hammer problem Stud Failures 1 Catastrophic failures 1 See Catastrophic Failures problem 2 Improper nut torquing 2 Check torque specifications and torque to correct values 3 Stud bending due to unev...

Страница 40: ...Assembled in Journal Bearing Housing 7 755 7 759 Crosshead Guide Bore 302TLS100 13 500 13 502 Babbitt Crosshead Guide Bore 303TLS100 13 557 13 562 Crosshead without Babbitt 302TLS005M 13 487 13 489 C...

Страница 41: ...sshead Guide to Pump Frame 3 4 10 200 Crankshaft Bearing to Pump Frame 3 4 10 290 Suction Manifold to Fluid End 7 8 9 320 Discharge Flange to Fluid Cylinder Nuts 1 1 8 12 1080 Gear Reducer to Pump Fra...

Страница 42: ...to Purchaser whichever occurs first The exceptions are as follows 1 Power end is warranted for twelve 12 months from date of start up or eighteen 18 months from date of delivery to the Purchaser whic...

Страница 43: ...o title the foregoing warranty is the sole and exclusive warranty of the Company The Company hereby extends other manufactures warranty or guaranties if any given to Company by such manufacturer but o...

Страница 44: ...breach of this warranty must be commenced within one year after the date upon which the cause of action occurred Any adjustment made pursuant to this warranty shall not be construed as an admission b...

Отзывы: