3-1-618    Page 4

 

Operating  a  pump  against  a  blocked  or 
restricted  discharge  line  can  produce 
excessive  pressures  in  the  entire  discharge 
system,  which  can  damage  or  burst 
discharge system components.   

 
 

 

DANGER 

 

Never  operate  a  pump  without  a 
properly sized pressure relief valve or 
working  overpressure  shutdown    in 
the 

discharge 

line 

immediately 

adjacent to the pump discharge. 

 
 
The  relief  valve  should  be  placed  in  the 
flowing  discharge  line  and  not  at  the 
opposite  end  of  the discharge manifold in a 
dead  end  connection.    The  dead  end  may 
become  clogged  with  solid  material  carried 
in  the  fluid,  which  could  prevent  proper 
relief valve operation. 
 
 

  

 

 

DANGER 

 

Never  place  a  shut-off  valve  or  any 
other  component  between  the  pump 
discharge 

connection 

and 

the 

pressure relief valve. 

 
 
Make  sure  the  pressure  relief  valve  is 
installed so any pressurized relief discharge 
from  the  valve  is  directed  away  from 
possible  contact  with  people  or  equipment.  
The  relief  valve  must  be  set  to  relieve  at  a 
pressure  equal  to  or  below  the  maximum 
pressure  values  shown  on  the  pump  data 
plate.    However,  if  a  component  is  used  in 
the  discharge  system  with  a  lower  rated 
pressure  capability  than  that  listed  on  the 
pump  data  plate,  the  pressure  relief  valve 
must be set to relieve at a pressure equal to 
or  below  the  rated  capability  of  the  lowest 
rated component. 

 

 

Before  starting  the  pump  every  time, 
check to insure: 

 

The pressure relief valve is in good 
operating  condition and has been set to 
the proper relief pressure. 

 

 

Any  pipe  line used to direct pressurized 
relief flow to another location, such as a 
collecting tank, is not blocked. 

 

 

The  discharge  system  is  not  blocked 
and  all  the  discharge  line  valves  are 
open. 

 
Check  all  fluid  end  discharge  system 
components  including  pipes,  elbows 
connections,  threads,  fasteners,  hoses, 
etc.,  at  least  once  every  six  months  to 
confirm  their  structural  adequacy.
    With 
time,  wear,  corrosion  and  fatigue  can 
reduce  the  strength  of  all  components.  
Magnetic  iron  and  steel  components should 
be  checked  with  magnetic  particle  or  dye 
penetrant 

crack 

detection 

equipment.  

Nonmagnetic  materials  should  be  checked 
for  cracks  with  dye  penetrants.    All  metallic 
components 

should 

also 

be 

visually 

checked  during  these  inspections  for  signs 
of  corrosion.    If  a  component  shows 
evidence of cracking or loss of material due 
to  corrosion  it  must  be  replaced  with  a  new 
part. 
 
Continually  monitor  suction  and  discharge  
hose  assemblies  when  the  pump  is 
operating  for  leakage,  kinking,  abrasion, 
corrosion  or  any  other  signs  of  wear  or 
damage. 
 
Worn  or  damaged  hose  assemblies 
should be replaced immediately
.  At least 
every six months examine hose assemblies 
internally 

for 

cut 

or 

bulged 

tube, 

obstructions  and  cleanliness.    For  segment 
style  fittings,  be  sure  that  the hose butts up 
against  the  nipple  shoulder,  the  band  and 
retaining  ring  are  properly  set  and tight and 
the  segments  are  properly  spaced.    Check 
for  proper  gap  between  nut  and  socket  or 
hex  and  socket.    Nuts  should  swivel  freely.  
Check the layline of the hose to be sure that 
the assembly is not twisted. Cap the ends of 
the  hose  with  plastic  covers  to  keep  them 
clean  until  they  are  tested  or  reinstalled  on 
the 

pump 

unit. 

Содержание GD-3000

Страница 1: ...ECN 1058968 GARDNER DENVER 3 1 618 Revision D April 2011 WELL SERVICING PUMP MODEL GD 3000 OPERATING AND SERVICE MANUAL...

Страница 2: ...in pump maintenance and repair They are ready to respond and assist you by providing fast expert maintenance and repair services For the location of your local authorized Gardner Denver distributor r...

Страница 3: ...peration and minimal downtime DANGER Danger is used to indicate the presence of a hazard which will cause severe personal injury death or substantial property damage if the warning is ignored WARNING...

Страница 4: ...Ordering Repair Parts i Foreword ii Index iv List of Illustrations v Section 1 Danger Notices 1 Section 2 Design Description and Specifications 9 Section 3 Preparation Operation and Maintenance 15 Se...

Страница 5: ...ly Routine Maintenance Schedule 19 Oil Stop Head Seal Retainer and Crosshead Guide End Plate 24 Ordering Instructions Repair Parts i Performance Rating 14 Periodic Routine Maintenance Schedule 18 Plun...

Страница 6: ...2 GD 3000 Power End 10 Figure 2 3 GD 3000 Power End Top View 11 Figure 2 4 GD 3000 Gear Reduction Unit 12 Figure 2 5 GD 3000 Fluid End 13 Figure 3 1 Lubricant Recommendations 17 Figure 4 1 Tightening...

Страница 7: ...begin or continue operations when tired distracted or under the influence of alcohol or any type of prescription or nonprescription drugs The timely replacement of expendable parts and any other worn...

Страница 8: ...e they have safe footing Fully engage the wedge to prevent it from disengaging violently from the cover as a blow is struck Wipe their hands and the hammer handle and maintain a firm grip on the handl...

Страница 9: ...nnected to the lifting attachments normally built into the package unit support skid Packages too large to lift as fully assembled should be separated into smaller loads For these smaller loads the li...

Страница 10: ...f pressure Any pipe line used to direct pressurized relief flow to another location such as a collecting tank is not blocked The discharge system is not blocked and all the discharge line valves are o...

Страница 11: ...trols are clearly tagged with warnings not to start the pump while repair work is in process Whenever the pump is operating continually monitor the entire suction discharge and pump lubricating system...

Страница 12: ...eration and stop ongoing operation if flammable or explosive vapors are detected Hot surfaces sparks electric current or engine exhaust could ignite flammable or explosive vapors Each engine used as a...

Страница 13: ...damage The operators should take frequent rest breaks and cease operations when they become tired or distracted Before the equipment is started the work area must be inspected and properly prepared t...

Страница 14: ...quality of design construction and safety since these components are among the most critical to the safe operation of high pressure liquid jetting blasting and cleaning equipment After you have selec...

Страница 15: ...r software developed by American Gear Manufacturers Association The issue of personnel safety is the most important topic covered in this manual Therefore in the beginning of this manual the user is i...

Страница 16: ...ques presents information useful for pump rebuilding and assembly including dimensional and tolerance data running clearances for all bearings and recommended fastener torques PUMP DESIGN The GD 3000...

Страница 17: ...kle joint design is essentially standard but utilizes a large knuckle 7 and crosshead 13 5 thus allowing extremely high rod load 350 000 lbf See FIGURE 2 3 Also the pump has a drain pan to collect the...

Страница 18: ...n the bottom of the frame in the center cylinder Oil passages at the forward part of the frame members allow the end cylinders to drain to the center Oil is also drained from three 1 crosshead drains...

Страница 19: ...olt nuts The conventional valve over valve configuration offers field proven arrange ment in terms of valve and spring performance Improvements in the fluid end life come from increasing fluid cylinde...

Страница 20: ...10 49 13 12 22 007 5 11 19 635 0 065 3 62 4 54 5 68 6 72 8 44 10 52 12 96 16 20 17 825 5 5 11 23 758 0 078 4 38 5 49 6 88 8 13 10 21 12 73 15 68 19 60 15 000 5 75 11 25 967 0 086 4 79 6 00 7 52 8 89 1...

Страница 21: ...ges 5 Remove the breather and either plug or tape the opening 6 Coat the gear reducer input shaft and all extension rods with a heavy rust preventive 7 Plug drain holes at the bottom of the pump frame...

Страница 22: ...nts In the past failure to meet these requirements has lead to pump damage because of restricted oil flow in the lube pump inlet Therefore the following guidelines developed as a result of long experi...

Страница 23: ...o the volume to be pumped by the triplex pump so that there is no less than 40 psi charge when the triplex pump operates at its maximum flow The first startup and several hours of the pump run in are...

Страница 24: ...pressure rating for 30 minutes 11 During this time observe the suction vacuum gage reading oil pressure and temperature and check for leaks 12 Run the pump at 80 90 strokes per min at the following l...

Страница 25: ...perform these tasks 4 Listen for any abnormal noise or rough operation which may indicate the need for fluid end maintenance such as changing valves or valve seats Due to very high pressures in the t...

Страница 26: ...ps Petroleum EP 500 Summer or EP 300 Winter 10 F Shell Oil Co Torcula Oil 32 50 F Torcula Oil 100 20 F Torcula Oil 150 15 F Torcula Oil 320 10 F Sun Oil Co Rockdrill 500 Light 5 F Rockdrill 1000 Heavy...

Страница 27: ...ile working on pump FLUID END SERVICE This discussion starts with the description of steps necessary for removal and installation of the fluid cylinder assembly and proceeds to the removal and replace...

Страница 28: ...nger clamps piping connections and auxiliary equipment FIGURE 4 1 Tightening Sequence for Fluid End Nuts Plunger and Packing Replacement This service procedure can be performed with the fluid cylinder...

Страница 29: ...nt twisting while loosening the stuffing box 4 Loosen the stuffing box using the stuffing box wrench 5 Carefully remove the stuffing box from the cradle area 6 Clean and oil the packing bore in the st...

Страница 30: ...ng the engine inadvertently The power end service procedures deal first with major assemblies namely crosshead connecting rod crankshaft and knuckle joints and then describe how to access all individu...

Страница 31: ...ice to the thread of the crosshead front half and lift off 14 Remove the thrust bearing 15 Remove the snap rings from the wrist pin 16 Remove the wrist pin while supporting the crosshead back half 17...

Страница 32: ...the crankshaft from disengaging with the frame see Special Tools section of Parts Manual 8 Move the gearbox and the splined adapter to the service area Crankshaft Assembly 1 Remove the pump from the...

Страница 33: ...he right side of the frame and the left end bearing and center left bearing out the left side of the frame 17 With bearing locks removed bearings may be driven out of bore with a hammer and brass or a...

Страница 34: ...3 Clogged suction line 3 Clean out line 4 Suction and or discharge 4 Remove the obstruction valves propped open Low Discharge Pressure 1 Worn or fluid cut valve 1 Replace valve assembly 2 Valve proppe...

Страница 35: ...settling time in supply tank Reduce pump speed 10 Air entering suction line 10 Repair suction line 11 Air entering charging pump 11 Tighten or replace shaft packing or seal 12 Air entering or charge...

Страница 36: ...ise transmitted to 11 See Excessive Valve power end Noise problem 12 Cavitation noise transmitted 12 See Cavitation Fluid to or causing shock loading in Knock or Hammer problem power end Excessive Val...

Страница 37: ...and sealing surface 4 Corrosion due to wrong 4 Determine and install correct stuffing box material stuffing box for pumped fluid 5 Stuffing box bore worn 5 Replace stuffing box Pumped Fluid In 1 Worn...

Страница 38: ...ons Customer Service 5 Wrong size packing 5 Install correct size packing 6 Improper packing installation 6 Check installation procedure and install correctly 7 Excessive crosshead wear 7 Replace cross...

Страница 39: ...r Hammer problem Stud Failures 1 Catastrophic failures 1 See Catastrophic Failures problem 2 Improper nut torquing 2 Check torque specifications and torque to correct values 3 Stud bending due to unev...

Страница 40: ...Assembled in Journal Bearing Housing 7 755 7 759 Crosshead Guide Bore 302TLS100 13 500 13 502 Babbitt Crosshead Guide Bore 303TLS100 13 557 13 562 Crosshead without Babbitt 302TLS005M 13 487 13 489 C...

Страница 41: ...sshead Guide to Pump Frame 3 4 10 200 Crankshaft Bearing to Pump Frame 3 4 10 290 Suction Manifold to Fluid End 7 8 9 320 Discharge Flange to Fluid Cylinder Nuts 1 1 8 12 1080 Gear Reducer to Pump Fra...

Страница 42: ...to Purchaser whichever occurs first The exceptions are as follows 1 Power end is warranted for twelve 12 months from date of start up or eighteen 18 months from date of delivery to the Purchaser whic...

Страница 43: ...o title the foregoing warranty is the sole and exclusive warranty of the Company The Company hereby extends other manufactures warranty or guaranties if any given to Company by such manufacturer but o...

Страница 44: ...breach of this warranty must be commenced within one year after the date upon which the cause of action occurred Any adjustment made pursuant to this warranty shall not be construed as an admission b...