Installation and operating instructions 17
6.
Installation
6.28
• Align the closing edge rail (A) flush with the upper track (B).
• Secure the position with a screw clamp.
• Drill through the closing edge rail (A) into the wall.
• Screw the closing edge rail (A) to the wall.
• Cover the drill holes in the closing edge rail (A) with the cover
buttons (C).
• Remove the screw clamps.
A
B
C
6.29
6.6
Fitting the covers
• Place the upper plug cover (A) in the upper roller rail (B) over
the door opening.
6.30
A
B
• Release the door.
• Move the door slowly into the OPEN and CLOSED positions.
Advice:
Quick release operation is described in section 7.
Check:
The door must move easily into the OPEN and
CLOSED positions.
≥
ø 6
www.thegaragedoorcentre.co.uk
0800 525 442
www.thegaragedoorcentre.co.uk
www.thegaragedoorcentre.co.uk
0800 525 442
www.thegaragedoorcentre.co.uk