A. PAN Origin Test
Zero point of Pan is Located during the Panning test.
B. Tilt Origin Test
Zero point of Tilt is Located during the Tilt Test
C. TX Connection Test
Wait for 60 seconds for TX Connection Test.
During 60 seconds, the camera is must received a signal by any control equipment as DVR or
controller. Then OK is displayed then automatically verifying TX Connection Test
•
If
“
Not Tested
”
is displayed in the test.
- The result which is not received any signal from DVR or controller.
- Wrong connecting way such as the protocol, baud rate or RS-485 connection.
The use may check the install way carefully.
D. Camera Comm. Test
Camera communication is also checked.
OK should be displayed in these four tests before installation.
If all the above Tests are OK,
“
NOW EEPROM CHECKING
”
and
“
ALL DATA
INITIALIZING
”
is displayed and the camera is ready to operate.
OSD Menu Setting
A. OSD Menu Table
Содержание ZC-PT336N-IR
Страница 5: ...Part Names B Connection Method...
Страница 15: ...OSD Menu Setting To enter OSD Menu press the button 95 Preset then OSD Main Menu is displayed...
Страница 30: ...Dip Switch Setting...
Страница 31: ...Dip Switch Setting...
Страница 32: ...Dip Switch Setting...
Страница 33: ...Dip Switch Setting...
Страница 34: ...Dip Switch Setting...
Страница 37: ...Specification...
Страница 38: ...Dimensions...
Страница 39: ......