Installation
17
· G&D DP1.2-Vision-Fiber
Transmission|Rx:
Insert the LC plug of the fibre optic cable connected to the
Transmis-
sion|Tx
interface of a compatible computer module or matrix switch.
Establishing the power supply
Main Power:
Insert one of the supplied IEC cables here.
Red. Power:
To provide a second, redundant power supply, connect a portable power
pack to this interface.
Main P
ower
Red. Power
Transmission
USB 2.0 Trans.
Keyb./Mouse
RS232
DP Out
Line In Speaker
Generic
Keyb./Mouse
USB 2.0 Devices
Содержание DP1.2-Vision-Fiber
Страница 74: ... ...
Страница 75: ... Deutsch ...
Страница 148: ... ...
Страница 149: ... English ...
Страница 150: ... ...
Страница 151: ... English ...