12
-
Ed.
1/2012 Rev.0
ENG
SECTION 2
INSTALLING THE MACHINE
2.1 Unpacking
Normally unpacking involves:
Step
Action
1
Remove the fastening strap from the cardboard box
and the wooden bedplate (pallet) by using a suitable
tool (pair of scissors, cutter, etc).
2
Remove the unit from the carton
3
Take away the anti-static PVC bag and the expanded polystyrene.
4
Carefully sling the machine by protecting the parts of the structure that make
direct contact with the lifting ropes/belts.
5
Lift the machine from the wooden bedplate (pallet) and unload it in the
allotted site on the ground.
6
If necessary, use a soft and dry cloth to clean the outside part.
7
proceed with the removal of the boards of polystyrene designed to protect
the refractory tiles.
The machine must be handled only by personnel who are trained and
familiar with the risks and the procedures related to unpacking,
lifting and correct handling.
Lift only by the help of suitable mechanical means. Absolutely ruled
out lifting and manual handling.