Revision 1
69
9/10/2019
5.4.2 Analysis Data
The data for the analysis stream is presented. The data presented is the last or current
results. If an operation is in progress, the appropriate field will be highlighted in blue. The field
that is highlighted in yellow is the next operation to be executed in the queue. The stream
field definitions are listed in the table. If an operation is setup to run through the usage of
timers (located on the
Timers
Tab (Section 5.18) the operation to be executed next will not be
highlighted until it has reached its start time and only after the current operation has finished
will the operation in the queue commence.
Table 5-6: Stream Fields
Sample
The
Sample
field either shows the current analysis reading if
highlighted blue or the last reading when that stream was run.
Reference 1
The
Reference 1
field either shows the current analysis reading if
highlighted blue or the last reading when that stream was run. A
reference gas is used as a periodic calibration check and cannot
change the gain
Reference 2
The
Reference 2
field either shows the current analysis reading if
highlighted blue or the last reading when that stream was run. A
reference gas is used as a periodic calibration check and cannot
change the gain
Zero
The
Zero
field either shows the current analysis reading if it
highlighted blue or the last reading when that stream was run. The
Zero run is a way to check what the analyzer will read on a gas that
contains no phosgene. Running a zero run will result in a new zero
offset being calculated for the analyzer.
Calibration
The
Calibration
field either shows the current analysis reading if
highlighted blue or the last reading when that stream was run. The
calibration is used to automatically calibrate the analyzer and
calculate a new gain factor.
Gain
The present gain for the stream measurement.
Offset
The present offset for the stream measurement.
Содержание ProTech903W
Страница 8: ...Revision 1 8 9 10 2019...
Страница 109: ...Revision 1 109 9 10 2019 Figure 5 34 Create Modbus List Dialogue Box...
Страница 112: ...Revision 1 112 9 10 2019 Figure 5 36 Typical Modcon with Floating Point List...
Страница 141: ...Revision 1 141 9 10 2019 Figure 6 18 Status Tab...
Страница 158: ...Revision 1 158 9 10 2019 Figure 10 1 DC Power Wiring Diagram Figure 1010 2 AC Power Wiring Diagram...
Страница 159: ...Revision 1 159 9 10 2019 Figure 10 3 External Furnace Wiring Diagram Figure 10 4 AC DC Power Wiring Diagram...
Страница 160: ...Revision 1 160 9 10 2019 Figure 10 5 Solenoid Drivers Wiring Diagram Figure 10 6 Relays Wiring Diagram...
Страница 164: ...Revision 1 164 9 10 2019 Figure 10 13 Isolated RS 485 Port Figure 10 14 P17 RS232 Port to Ethernet Cable...
Страница 171: ...Revision 1 171 9 10 2019...
Страница 172: ...Revision 1 172 9 10 2019 Section 13 MSDS Information...