background image

22 

 

7 WARRANTY CONDITIONS 

1Warranty for correct operation of the central heating boiler, certified by  a 
stamp  from  the  installer  and  from  the  point  of  sale,  and  signature  of  the 
seller is granted for a period: 
of 

36

  months  from  the  date  of  purchase  -  for  the  boiler  casing,  but  no 

longer than 36+12 months from date of manufacture *, valid throughout the 
territory  of  the  Republic  of  Poland,  Warranty  for  the  controller,  fan  and 
draught regulator is granted for a period of 12 months. 

2  The warranty shall be extended for the period from the day a repair has 
been requested to the date of notifying the buyer of the performance of the 
repair.  This  time  is  confirmed  in  the  repair  card  and  warranty  card.  The 
manufacturer  is  obliged  to  perform  a  warranty  repair  within  14  days  from 
the date of notification by the purchaser. 

3  The warranty card  is the  only document that  entitles the purchaser to a 
free warranty repair. A warranty card without date stamps and signatures is 
invalid. Duplicates of the warranty will not be provided in case of loss. 

4  The  warranty  expires  in  case  of  use  of  security  not  compliant  with  PN-
91/B-02413: connection of the boiler  in a closed system without adequate 
security  and  maintenance.  Repairs  performed  during  the  warranty  period 
by unauthorized persons, damage caused by failure to follow instructions. 

5  Claims  regarding  the  quality  of  the  boiler  should  be  reported  to  the 
manufacturer by sending  a completed claim coupon filled out by  the point 
of sale. 

6  If the claim proves to be unjustified, the costs associated with the arrival 
of a representative are to be covered by the person making the claim. 

7  The  warranty  does  not  cover  cast  iron  components,  boiler  connections, 
the draught regulator and thermometer. 

The  warranty  will  be  declared  invalid  in  case  it  is  discovered  that 

fuels are burned that cover the walls of the boiler  with tarry, difficult 
to  remove  deposits,  something  that  indicates  boiler  temperatures 
below 50

o

C were maintained for longer periods of time.

 

9  In case of lack of access to the boiler or the controls, the technician will 
not  perform  repair  or  maintenance  activities  and  the  user  will  be  charged 
with travel costs. 

10 The  scope  and  method  of  the  warranty  repair  is  decided  by  the 

warrantor. 

11 In  case  of  damage  to  the  controller,  which  exhibits  itself  in  the 
continuous  operation  of  the  fan  motor  or  pump,  the  claim  will  not  be 
recognised,  because  this  damage  was  caused  by  a  short  circuit  in  the 
given  element.  The  fuse  on  the  controller  protects  the  components  from 
overload, but not from a short circuit. 

Содержание KW-10

Страница 1: ...post pl tel 796 067 784 Operation and installation manual Warranty Card Please read the instructions before installation and use of the product Water boiler for central heating GT kW with cast iron grate with water cooled grate standard version with draught regulator with fan and controller Controller Fan LX EKO pid MM LX EKO pid 2 EW ST 32 pid ...

Страница 2: ...2 www galmet com pl ...

Страница 3: ...3 ...

Страница 4: ...4 ...

Страница 5: ...5 ...

Страница 6: ...lating Panels 13 2 6 Tools supplied with the boiler 13 3 BOILER INSTALLATION 13 3 1 Transporting the boiler 13 3 2 Setting up the boiler 14 3 3 Connecting the boiler 14 3 4 Central heating installation diagram 16 4 BOILER USE AND MAINTENANCE 17 4 1 Lighting the boiler 17 4 2 Adding fuel 18 4 3 Stopping boiler operation 18 4 4 Cleaning the boiler 18 5 CONDITIONS FOR SAFE USE OF THE BOILER 19 6 IMPR...

Страница 7: ...with a high calorific value and adequate granulation is used 1 1 Application Steel boilers of the GT KW GT KWR GT KWRU GT KWRUZ types are intended for heating single family houses equipped with hydronic central heating of an open type system with gravitational or forced circulation The system within which the boiler operates must be equipped with safety features in accordance with the requirements...

Страница 8: ... boiler dm 3 30 40 51 66 76 Boiler heating surface m 2 0 7 1 0 1 5 2 1 2 6 Boiler weight kg 127 165 210 265 300 Required chimney capacity Pa 22 Min chimney height m 5 Chimney size mm 140x140 140 x 210 Operating temperature range C 50 90 Thermal efficiency 80 Exhaust gas temperature C 250 Connections 1 25 1 5 Boiler height mm 880 960 1110 1260 1360 Boiler width mm 340 410 410 500 500 Boiler depth m...

Страница 9: ...t m 5 Chimney size mm 140 x 210 Operating temperature range C 50 90 Thermal efficiency 80 Exhaust gas temperature C 250 Connections 1 5 Boiler height mm 960 1110 1260 1360 Boiler width mm 410 410 500 500 Boiler depth mm 760 870 870 1000 Flue height from the floor mm 735 880 1040 1140 Flue dimensions mm 150 x 150 180x180 Perm working pressure MPa 0 2 Controller power consumption W 4 Fan power consu...

Страница 10: ...fficiency 80 Exhaust gas temperature C 250 Connections 1 5 1 5 2 2 5 2 5 3 Boiler height mm 1120 1220 1390 1480 1540 1550 Boiler width mm 465 580 650 750 750 910 Boiler depth mm 980 1190 1340 1560 1590 2050 Flue height from the floor mm 885 1025 1070 1260 1290 1230 Flue dimensions mm 150x150 180x180 200x200 250x250 250x250 300x300 Perm working pressure MPa 0 2 Controller power consumption W 4 Fan ...

Страница 11: ...lls and into the water With these boilers it is possible to achieve combustion from the bottom by ignition from the top through the fuel loading hatch The air from the fan passes over the cold fuel and only the upper part of it burns The boiler s power output is reduced by the area of the chamber walls occupied by the cold fuel Fuel burns gradually allowing for stable control over the power output...

Страница 12: ...E A B C D E F H I J L M R KW 7 470 340 650 630 170 410 880 110 150 200 160 270 KW 10 550 410 735 750 180 480 960 150 150 260 170 320 KW 15 660 410 880 870 200 600 1110 160 150 260 200 370 KW 20 660 450 1050 870 250 600 1260 170 150 310 240 420 KW 25 670 500 1140 1000 250 600 1360 180 180 360 240 420 KWR 11 550 410 735 750 180 480 960 150 150 260 170 320 KWR 17 660 410 880 870 200 600 1110 160 150 ...

Страница 13: ...9 Air flap 10 Grate hatch 11 Flue with damper 12 Boiler insulation 13 Cold water connection 14 Hot water connection 15 Thermometer 16 Regulator 17 Controller 18 Fan 19 Secondary air inlet 20 Lower combustion flap 21 Smoke closure 22 Bottom cleaning hatch 23 Top cleaning hatch for KWRUd type boiler not used in KWRUz type boilers BOILER TYPE A B C D E F H I J L M R KWRuz22 760 465 885 980 250 695 11...

Страница 14: ...nual air intake flap operated using a screw or a controller mounted on the 3 4 connection on the boiler body 2 4 Flue The boiler has a welded flue with a rectangular cross section with an adjustable damper The flue can be screwed into the boiler with four M10 bolts and sealed with a cord gasket or it can be welded At the bottom of the flue there is a cleaning hatch for removal of ash and soot from...

Страница 15: ...hould be placed in the boiler room so that it is away from easily flammable items fuel should be fenced off 3 3 Connecting the boiler The right height and diameter of the chimney have a significant impact on the proper operation of the boiler Check that the chimney is made in accordance with the PN 91 B 02413 standard The flue is to be connected to the chimney through a connection made of sheet me...

Страница 16: ...alled in closed central heating systems provided that a DBV or JBV cooling valve is installed and water from the mains is provided in a continuous uninterrupted manner In accordance with safety regulations and the instruction manual for DBV JBV valves their proper operation should be verified each day by turning the knob Installation of cooling coil and cooling valve on the boiler option Cooling c...

Страница 17: ... 07 06 fan 5 Adjustment screw for fan flap 6 Boiler overheat sensor 7 Boiler temperature sensor 8 DHW temperature sensor 9 Differential valve 10 Central heating pump 11 DHW pump 12 Expansion vessel 13 Overflow and bleed pipe 14 Indicator tube 15 Indicator tube valve 16 Drain valve 17 Sewage grille 18 Exhaust gas sensor optional ...

Страница 18: ...wer output and fuel type Up to 20kW maximum fan power is 20 Select an appropriate blow off for the burning process to last as long as possible and maintain the desired temperature If a large volume of burning embers is present in the firebox setting a lower temperature in the controller will not reduce the temperature immediately the fan will be turned off until the boiler cools down Until then co...

Страница 19: ...ilation boiler room door open For the summer period when the boiler is not in use clean the boiler firebox heat exchanger channels tubes of soot and ash In addition open all hatches After the summer break period test circulation pumps mounted in the system and the fan before starting the boiler 4 4 Cleaning the boiler The boiler must be cleaned in order to ensure good heat exchange with the heat e...

Страница 20: ...onnected with the maintenance of the boiler should be kept there Take care of the boiler frequent cleaning ensuring hatches are tightly closed on the boiler flue and chimney and the connected water system In systems with forced circulation use a gravity by pass with a differential valve This ensures that in case of power failure the hot water from the boiler can flow to the radiators and cool down...

Страница 21: ...crease single fuel portion FUEL DOES NOT BURN COMPLETEL Y bad air adjustment insufficient chimney draught increase the amount of air choose blow off time and power check chimney size and flue SLAG FORMS too high temp of burning too low temperature of coal ash melting reduce the amount of air change fuel EXHAUST GAS OUTFLOW FROM BOILER dirty heat exchanger channels tubes closed flue damper gaskets ...

Страница 22: ...te security and maintenance Repairs performed during the warranty period by unauthorized persons damage caused by failure to follow instructions 5 Claims regarding the quality of the boiler should be reported to the manufacturer by sending a completed claim coupon filled out by the point of sale 6 If the claim proves to be unjustified the costs associated with the arrival of a representative are t...

Страница 23: ...23 ...

Страница 24: ...nician Name and address of the owner User signature Repair date Description of repair Stamp and signature of the technician Name and address of the owner User signature Repair date Description of repair Stamp and signature of the technician Name and address of the owner User signature Date of commissioning Name of installer Installation description Installer s stamp Name and address of the owner U...

Страница 25: ...oupon 2 WARRANTY CARD Date of sale Date of manufacture No of fan No of controller Serial No Boiler type technika grzewcza Warranty Coupon 3 Galmet Sp z o o Sp K 48 100 Głubczyce ul Raciborska 36 tel 48 77 40 34 500 fax 48 77 40 34 599 customer service 48 77 40 34 530 e mail serwis galmet com pl Date of sale Date of manufacture No of fan No of controller Serial No Boiler type technika grzewcza Noti...

Отзывы: