9
Whilst others imitate we continue to innovate. Why settle for a copy when you can have the original?
Tel: 941 697 0324 | Fax: 941 697 1249
[email protected] | www.galaxymultirides.com
Setting Up Your Toxic Trampoline Meltdown™
Lift the Sweeper
center block onto the
main frame and attach
to the motion base
as described. (Colors
may change from the
ones pictured).
10.
Make sure the
mounting bracket
is loose. Attach
the center piece of
the Meltdown to
the motion system.
Place the sub frame
in position and pull
towards the back.
Finally, tighten the
12mm. by 100mm.
draw bolt until the
ride frame is pulled
back fully. Now,
tighten up the locking
nut on the draw bolt.
This bolt pulls the
frame down onto the
motion base.
IT’S
NOT NECESSARY TO
OVER TIGHTEN THE
BOLTS
.
First, tighten the
12mm. by 100mm.
draw bolt. Do not
over torque it at this
time. Now, tighten
the two 12mm. bolts
to clamp down the
bracket with the
19mm. wrench doing
3 or 4 turns on each
bolt at a time. These
two bolts draw the
frame back onto the
mounting bracket.