Please Note: the product should be installed before tiling is added to the bathroom wall.
The electrical connection should be made via either a standard UK mains fused plug
or fused spur.
1. Initial fitting
1.1
As per the drawing, use chisel to form a groove on the wall 50mm deep,
put in water pipe and line pipe (The dimensions shown are suggestions
and may vary for individual needs)
1.2
As per the drawing, chisel another groove on the wall, 130mm wide,
130mm long, 50mm deep accommodate the cassette.
2. Install the water pipe and the line pipe into the groove
:
2.1 As on the drawing, place the water pipe and the line pipe into the
Grooves created
2.2 As per the drawing the connection for G1/2 should be sited external
to the wall ensuring that it is 50mm above the bathroom ceiling.
2.3 Punch the hole of the cassette on the left side using a screwdriver,
then place the cassette into the groove. Secure the cassette with
adhesive and ensure the line pipe is connected with the cassette.
2.4 Apply tiles and grout to the wall remembering to keep a suitable area
place for the G1/2 and cassette.