![Galanz XQG90-T514VE Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/galanz/xqg90-t514ve/xqg90-t514ve_service-manual_3247248021.webp)
XYJGT90100TVE-001
20
execute the automatic detection mode; if you turn the program knob, the program will execute the
manual detection mode. The specific process is as follows:
设定
Set up
描述
Describe
C01
预洗阀测试
(
P02
位置)
C01 pre washing valve
test
(P02 position)
注水设定时间
Water injection setting time
C02
主洗阀测试
(
P03
位置)
C02 main washing valve
test
(P03 position)
注水设定时间
Water injection setting time
C03
软化阀测试
(
P04
位置)
C03 softening valve test
(P04 position)
注水设定时间
Water injection setting time
C04
热水阀测试
(
P05
位置)
C04 hot water valve test
(P05 position)
注水设定时间
Water injection setting time
此功能预留
This function is reserved
C05
加热测试
(
P06
位置)
C05 heating test
(P06 position)
判断水位是否已在
WL00
水位以上,如未到必须软化阀先补水至加
WL00
水位,然后开始加热,加热设定时间
Judge whether the water level is above WL00 level. If not, make up
water to WL00 level by softening valve, then start heating, set heating
time
C06
电机转动方向测试
(
P07
位置)
C06 motor rotation
direction test
(P07 position)
正转设定时间
Forward rotation setting time
C07
外筒泄漏测试
(
P08
位置)
C07 outer cylinder
leakage test
(P08 position)
判断水位是否已在洗涤
1
水位,如未到必须先补水至洗涤
1
水位,反
转设定时间
Judge whether the water level is at the level of washing 1, if not,
make up water to the level of washing 1, and reverse the set time
C08
排脱水测试
(
P09
位置)
C08drain water test
(p09 position)
先排水至空筒
0
水位以下,然后以最高速脱水(无须不平衡检测),加
速及高速过程持持续设定时间
,
关闭电机输出。
First drain water to the level below 0 of the empty cylinder, then
dehydrate at the highest speed (without imbalance detection), and
the motor output will be turned off when the acceleration and
high-speed process lasts for a set time.
注:
Note
:
◆
测试过程中,检测故障报警,如在当前阶段发生时,立即报警,并停止执行程序。
◆
In the process of testing, detect the fault alarm, if it occurs in the current stage, immediately alarm