ĐŽŶƚĂĐƚΛƵŶŐƵĂƚŽƌ͘ĐŽŵͮƵŶŐƵĂƚŽƌ͘ĐŽŵ
16
04
15
_E
M
P3
en
chapter 3 - page 3
Installation Quali
fi
cation (IQ) / Operation Quali
fi
cation (OQ)
We recommend before using the device for the
fi
rst time to perform a function test
- Installation Quali
fi
cation (IQ) -.
• IQ - Mode
Fill a 50 ml gako unguator Jar with following testing compound:
Iron oxide (or a di
ff
erent colourful test substance)
0,01
Semi-solid foundation
ad
50,00
Insert the SRF into the test jar and close it.
Push the gako button for two seconds, the program starts and the lift arm moves to the moun-
ting position. Attach the mixing unit into the quick-lock coupling (review chapter 4 “quick-lock
coupling”). The function test starts after a push on the gako button. The lift arm moves into the
start position, the mixing shaft locks automatically and the mixing process begins.
Every mixing speed level runs
fi
ve seconds, to test intern if the actual speed of rotation equals
the level of the given speed of rotation.
After the process the display shows the resulting value as “OK” or “not OK”.
• not OK
If the mixing speed level test determines discrepancies, the display shows “please contact gis@
unguator.com”. Please contact the technical service per email with the serial number of the
gako unguator EMP.
By pushing the gako button the start screen appears.
pic.: Display IQ - Mode
pic.: Display contact