English
23
7
7
START UP
77
Once the water and electrical connections have been
made, proceed to start up the machine.
77
Open the mains water supply tap (A).
77
Close the protection switch (D).
77
Position the machine power button (13) to position
"1".
77
The machine switches on and the display shows the
software version.
7777
Then the display shows the screen indicated in the
image.
7777
The auto-levelling device comes into operation so that
the water reaches a normal level in the boiler.
77
Wait until the machine reaches the set point
temperature set on the display.
77
Check the pump pressure on the gauge (5) by starting
up a group with the filter holder inserted and filled
with regularly grinded, dosed and pressed coffee, in
order to get the real brewing pressure (8-9 bar for
espresso).
77
The machine is now ready for use.
77
Brew
groups
warming
completes in about half an
hour after the set point
temperature
has
been
reached.
7
Do not press the hot water
outlet button before the
set point temperature set
on the display is reached.
77
For technical adjustments
refer
to
the
technical
manual.
7
7.1
Coffee filters supplied
7
Depending on the quantity of ground coffee, the
appropriate filter must be as shown below to avoid
that, once the coffee has dripped out, the coffee
grounds tablet remains attached to the brew unit.
77777
1 Cup
77777
2 Cups
7
Содержание La Giusta
Страница 41: ...cod 59A071301 Powered by TCPDF www tcpdf org ...