P a g e
|
36
Figure 42: Attach the S olar Module Assembly to the Deck
Step 4d:
Install Grounding...
The solar module assemblies must be grounded by following the
techniques described on pages 12-14. Slide the copper wire into WEEB® Grounding Lug.
(Figure 43). Tighten the WEEB® terminal screw with to 7 ft.-lbs. leave some slack in the copper
wire between solar module assemblies for wire management.
Step 4e:
Create the MLPE Map...
Create the MLPE map per manufacturer’s instructions (Figure 44).
This map is necessary to set up the monitoring system.
Figure 43: S olar Module Assemblies are grounded using #12 or #10 AWG Copper Wire
Bare Copper
Wire
MLPE
Peel the MLPE Bar Code
Affix the Bar Code to the MLPE Map
Figure 44: Create the MLPE Map
WEEB®
Grounding Lug
WEEB®
Terminal
Screw