background image

GABRIEL KERAMIK AB

STUDIO • 7

1000 

1000 

710 

45 

 

min 75

min 75

400 mm

1

600 mm

1

1

2a

2b

Assembly

Mark on the floor exactly where the 

stove is going to be placed. Also 

mark the direction of the opening. 

The example on the picture shows 

45°  from existing 90° corner.

In a corner

Set the base block (1) with a 10 

mm thick layer of mortar on the 

prepared floor. Make sure the 

regulation distance to the wall is 

kept. Level vertically and horizon-

tally. The opening can be directed 

at right.

Check the distance to the 

wall (min. 75 mm)

Before starting the assembly, 

make sure that the support is 

approved according to your 

building permit and that it is

in level with the floor.

Against a straight 

wall

Set the base block (1) with a 10 

mm thick layer of mortar on the 

prepared floor. Make sure the regu-

lation distance to the wall is kept. 

Level vertically and horizontally, 

see figure 1. The opening can be 

directed at right.

Check the distance to the 

wall (min. 75 mm)

Содержание STUDIO 400 Series

Страница 1: ...tent Tests and approvals 2 Explanation of symbols foreword 3 Body Preparations 4 Important measurements 5 Overall installation sequence 6 Assembly 7 17 Tiles and cassette Tiling preparation and assemb...

Страница 2: ...imney sweep before building the stove Weight from 1300 to 1800 kg Bearing support is required EU declaration of conformity Products covered by this declaration Product type Slow heat release appliance...

Страница 3: ...reas for sawing and placing of mortar are marked with a pen Control measurement Shows important measurements during assembly Trowel Shows where the clay mortar is placed Rendered areas Shows the areas...

Страница 4: ...mm 415 mm min 75 mm 415 mm Base block 680 mm Preparations In a corner Against a straight wall In a corner Against a straight wall Combustible wall Combustible wall Combustible wall Combustible wall Me...

Страница 5: ...1 8 8 8A 8A 9 10 10 10 10 10 10 11 13 13 13 12 12 min 75 mm min 75 mm min 75 mm Base block 680 mm No joints 1 17 shows the numbers of all parts see page 6 Important measurements STUDIO Corner wall po...

Страница 6: ...GABRIEL KERAMIK AB 6 STUDIO Start A 7 7 7 6 5 5 4 3 2 1 17 16 15 14 7 7 7 7 7 7 7 7 7 10 10 9 8A 8A 8 8 10 10 10 10 13 13 13 12 12 11 Overall installation sequence...

Страница 7: ...ion distance to the wall is kept Level vertically and horizon tally The opening can be directed at right Check the distance to the wall min 75 mm Before starting the assembly make sure that the suppor...

Страница 8: ...orrectly Set the outer block 3 with mortar The opening shall face the 45 marking on the floor step 1 Seal with insulation where indicated Set the outer block 4 with mortar level the soot hole with the...

Страница 9: ...nd horizontally Push the firebox block backwards as much as possible Place the insu lation and pull the firebox block back to lock the indsulation Set the second firebox block 8 on top of the first on...

Страница 10: ...r Check that the height is within the tolerane 508 mm For a better joint wipe the contact surfaces with a squeezed sponge then brush with a wet radiator brush Set the third firebox block 8A on top of...

Страница 11: ...he blocks Level vertically and horizontally Cut off the insulation Before continuing above the firebox opening construct a prop to sup port both the outer ring and the firebox top block as shown in th...

Страница 12: ...not be in contact Level vertically and hori zontally Check the control measurements see page 5 For a better joint wipe the contact surfaces with a squeezed sponge After wards gently brush the mortar j...

Страница 13: ...vel vertically and horizontally Seal with 2 3 mm insulation Set the flame protection block 13 with mortar Level vertically and horizontally Set the outer ring 7 in mortar Level vertically and horizont...

Страница 14: ...7 1980 mm 7 20 21 22 Set the outer ring 7 with mortar Level vertically and horizontally Assembly Set the outer ring 7 with mortar Level vertically and horizontally Set the outer ring 7 with mortar Lev...

Страница 15: ...k and the flame protection block Fix the insulation in the mortar string The insulation creates an expan sion gap aginst the divider block allowing the inner core to move vertically Set the divider bl...

Страница 16: ...top lid 14 with mortar Level vertically and horizontally Lay mortar over the damper and the pipeattachment Set the Leca blocks 16 with mortar The inside of the blocks shall be rendered with clay morta...

Страница 17: ...nel surfaces also the downside of the top lid when it is installed Top connected chimney Set the top lid 17 with mortar and make sure it is in level with the underlying flue gas hole Side connected ch...

Страница 18: ...thed trowel For the best result a joint width of 2 3 mm is rec ommended Wooden wedges recommended Seal with adhesive between tiles and body at the firebox and the soot holes Start tiling from the bott...

Страница 19: ...GABRIEL KERAMIK AB STUDIO 19 Kakelsats Studio Decor steel band 50 mm 310 x 210 mm 100 x 210 mm Decor steel band 30 mm Tiling plan...

Страница 20: ...ace the enclosed rockwool sheet Cut out a square hole the same size as the hole in the firebox plate as indicated Fit in the cassette so that the steel flanges round the cassette are inside the tiles...

Страница 21: ...ion Pass the flexible tube through the cassette bottom and fit it over the connecting flange Fasten the flange plate Mount the damper in the bottom of the cassette do not forget the cotter pins Make s...

Страница 22: ...t silicon seal Pull out the cassette approx 20 mm and apply silicon just inside the edge around the brass frame then push the cassette back in Even the seal with a wet finger dipping the finger into w...

Страница 23: ...ar in as it will restrict the inlet convection air flow to the cassette Press the fan carefully into the pre cut hole in the sealing block Note The fan must be moun ted so that air is sucked into the...

Страница 24: ...GABRIEL KERAMIK AB www gabrielkakelugnar se Tel 46 0 499 233 00...

Отзывы: