GABRIEL KERAMIK AB
18 • STUDIO
IMPORTANT STEPS PRIOR TO TILING
• Mark the centre line.
• Check that the floor is level.
• Check the body surface. Is it vertical? Be aware that
you must compensate for any irregularities.
• All tiles shall be in level vertically and horizontally.
• Adhesive shall be applied on
both tiles and body
with an 8 mm toothed trowel.
• For the best result a joint width of 2-3 mm is
rec ommended. Wooden wedges recommended.
• Seal with adhesive between tiles and body at the
firebox and the soot holes.
• Start tiling from the bottom and the centre and work
towards the sides.
• Do not block the hole/grate for inlet air for convection
heat.
• Glue or attach the decor lists with silicone.
Use clamps for the top list and a strap for the
bottom list.
• The tiles are hand-made - there might be some
variations in measurements and colours.
Tiling preparations and assembly